My WebLink
|
Help
|
About
|
Sign Out
Home
2009-10-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-10-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:21:48 PM
Creation date
3/23/2010 2:45:06 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/27/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and connect the houses on Oxford to the existing main. About 3,500 feet of main <br />is being abandoned and about 3,000 feet of main will be newly installed. This <br />will reduce maintenance costs in the future. The bids were opened for the project <br />last week and. the cost will be substantially lower than the lining project. The new <br />watermain is expected to be installed and operational by the end of November. <br />Member DeBenedet asked if there will be road closures. Duane Schwartz <br />answered there maybe some short. term closures. Deb Bloom stated. there will be <br />apre-construction meeting before construction starts with the contractor, school <br />district and post office to talk about road closures. <br />Duane Schwartz mentioned the Rice Street interchange project is on the fast track <br />from a design standpoint. 30% of the plans are complete and being reviewed. <br />90% of the plans are expected to be complete by the end of the year. <br />Member Vanderwall asked if the Walgreens is planning on the taking over the <br />North Heights Hardware. Deb Bloom answered they are and the vacant lot to the <br />south. as well. <br />Duane Schwartz mentioned there is a Lake Owasso Use Attainability stake <br />holders meeting on Wednesday, September 23 in the Council Chambers to present <br />the findings of water quality study that BARR Engineering did for Grass Lake <br />Water Management Organization. <br />Deb Bloom mentioned the road closure on Cleveland Avenue for a sanitary sewer <br />replacement. Paving should be done next week. <br />Duane Schwartz mentioned the Community Meeting Survey results. The City <br />held four town hall type meetings this summer. <br />Member Vanderwall asked if a margin of error could be added to the results since <br />only 55 people were surveyed. Hopefully any controversy can be avoided by <br />adding the margin of error. <br />Deb Bloom stated in her capacity as the City Engineer for the City of Falcon <br />Heights they did pervious pavement design for the City of Falcon Heights City <br />Hall parking lot. This was completed in late August. The pavement was installed <br />in the drive aisle so water from the parking spots drains into the drive aisle. An <br />education sign will be installed as a part of the project. <br />Member Vanderwall stated it would be good if pervious pavement would be <br />looked at when reconstructing school parking lots especially Brimhall Elementary <br />School. <br />Member DeBenedet asked why the sidewalk along Hamline by the library is <br />closed off. Deb Bloom answered she would check into why the sidewalk is <br />closed: She stated Ramsey County did recently do some improvements to the <br />sidewalk to widen it and make it more user friendly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.