My WebLink
|
Help
|
About
|
Sign Out
Home
2010-03-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-03-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2010 8:20:15 AM
Creation date
3/23/2010 3:08:05 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/23/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville PWET Commission Meeting Minutes <br />Page 3 -February 23, 2010 <br />and a link to the study available on the City's web site for PWET Commissioner <br />review and/or comment. <br />Member Stenlund suggested that the High School be contacted to make a class <br />project of monitoring the phosphate problem as a partnership in education of the <br />next generation. <br />Mr. Schwartz concurred, once the Study Group made a final recommendation and <br />allocation, future action could include determining additional resources and <br />volunteer opportunities. <br />RCL Intersection Request Staff Comments <br />Mr. Schwartz noted inclusion of preliminary staff comments, with staff compiling <br />more detailed comments on recommended intersection improvements received <br />from the Roseville Citizen's League (RCL) preserYtation at the January meeting <br />for sixteen (16) intersections they had identified for improvement. Mr. Schwartz <br />advised that, at the direction of the PWET Commission, the report could include a <br />history of the specific intersections; and potential funding options and <br />opportunities as mentioned by Mr. Kysylyczyn. <br />Chair DeBenedet suggested that a future discussion .vas prudent, at a meeting <br />later in the spring. <br />Projects Update <br />Ms. Bloom advised that the ad for bids for 2010 Pavement Management Plan <br />(PMP) improvements had been submitted today, with a variety of mill and <br />overlay projects, as well as approximately three (3) miles of major rehabilitation, <br />based on the overall project map discussed by the PWET Commission in the fall <br />of 2009. Ms. Bloom reviewed that project map, noting that this year's projects <br />would be funded entirely by PMP and State Aid funds. <br />Ms. Bloom further advised that this year's project would include an electronic bid <br />option in an effort to reduce staff time and project costs, with a discount provided <br />to contractors seeking bids on line via a digital download versus a paper copy <br />requiring significant reproduction costs. <br />Rosewood Drainage <br />Ms. Bloom updated members on the next phase of the Rosewood drainage <br />project, wetland/pond excavation on Rosewood Pond following retrofitting in <br />2009 of the rain garden, with other options being reviewed to prevent flooding, <br />including sanitary sewer lining. <br />Discussion included potential traffic delays or re-routing. <br />Dale Street Reconstruction Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.