Laserfiche WebLink
HIGHWAY 36 <br />~TGE STUDY <br />~R, ISSUF 7 <br />ZY ?C7~9 <br />~ :~ithin the remaining three concepts, there <br />are unique design options that also will be <br />considered. These concepts will be carried <br />forward for further evaluation. <br />What happens next? <br />...he next step is to refine the interchange <br />options and incorporate design geometries <br />required for acceptable traffic operations. <br />Those options that pass a more detailed <br />operational analysis will move forward for <br />a qualitative screening that will include such <br />factors as construction cost, right-of-way <br />impacts, and other social and environmental <br />factors. <br />What about impy-ovements to <br />Rice Sts^eet? <br />-.mprovements to Rice Street between County <br />Road B-2 and County Road B also will be <br />evaluated as part of the project. Factors <br />that will be taken into consideration when <br />determining necessary roadway improvements <br />include: <br />• Need for shoulders <br />• I~'eed for turn lanes <br />• Bicycle/pedestrian <br />accommodation <br />• Landscaping <br />RE~1A~[I~~II~G II~TTE~ZCIIANGL Ca1~TCEpT~ <br />a <br />