Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: March 24, 2009 <br />Item No: 7 <br />Item Description: Update on Twin Lakes Infrastructure Improvements and Stonn Water <br />Design <br />The Twin Lakes AUAR Subarea I Infrastructure Improvements consists of redeveloping an <br />existing industrial area into a revitalized business and residential district. The project will be <br />phased and build in conjunction with the development of adjacent private sites and as City <br />budget allows. The Public Improvement portion of the project involves constructing public <br />streets, sidewalks and utilities through the site area as well as intersection and freeway ramp <br />improvements along the edges of the site. <br />Since our last update we have made significant progress on two items. The first is the <br />streetscape concepts and the second is storm water managerent. <br />• On February 26, the City held a public open house for the streetscape concepts. Attached <br />are the streetscape boards that were presented at that meeting. <br />• The City will be responsible for meeting Rice Creek Watershed District storm water <br />management requirements for these public improvements. Attached is an overlay storm <br />water management layout, as well as two details that show the how we will incorporate <br />storm water management into our streetscape design. <br />Recommended Action: <br />Discussion of Twin Lakes Infrastructure Improvements <br />