Laserfiche WebLink
7. Public Hearing <br />None <br />8. Action Items <br />a.Consider Housing Redesign Application – 900 Grandview Ave. W. (HF35) <br />Executive Director Cathy Bennett explained the goals and purpose of the Housing Redesign and <br />provided a summary of the project and application at 900 Grandview Avenue W. She explained <br />that the project met the eligibility criteria for age of structure, pre renovation value of home, <br />household size and expected increase in value over 40%. Bennett presented pictures of the home <br />prior to renovation as well as an existing photo of the home in progress. The project has been <br />reviewed by the Roseville Development Review Committee (DRC) with recommended approval <br />contingent upon the addition of a front entry or front porch to blend the new and existing homes <br />together. <br />Bennett illustrated pictures of the housing and garage before the addition. She noted that a new <br />garage will be added to the project and showed how the front of the home is near completion. <br />The interior and back of the home is still in progress. <br />Bennett explained that the owner was in the audience to comment on the DRC’s recommendation <br />and answer HRA member’s questions. Mr. Brent Huberty and Owen Polifka presented details on <br />the home and proposed sketches for a front entry/porch. Mr. Huberty explained the porch roof <br />design issues to make sure that water drains property and the two portions of the home blend <br />together nicely. Mr. Huberty noted that if approved by the HRA that he would schedule the front <br />porch addition in the spring. <br />Member Kelsey asked what percentage of the project was complete (75%). She asked why the <br />owner applied for the program so late into the construction of the home. Mr. Huberty noted that <br />he only became aware of the program after the building permit was issued. Bennett explained <br />that this is a good example of how the program can make the project better and that Mr. Huberty <br />has good documentation of the home prior to the addition which is a requirement. <br />Member Bean asked what the total cost of the architect fees will be. ($4,500-$5,000). <br />Member Millasovich asked how much new space was added. (750 sq.ft. second level and 8 feet <br />on the first floor to the back of the home). <br />Both Member Bean and Chair Majerus noted the value of having a front porch and how that <br />provides a nice outdoor area for the family and to connect with the neighborhood. <br />Motion: <br /> Member Kelsey moved, seconded by Member Millasovich, to approve the Housing <br />Redesign Program Application for owners at 900 Grandview Ave in Roseville with the DRC’s <br />additional recommendations for a front entry and per the program requirements. <br /> Ayes: 5 <br /> Nays: 0 <br /> Motion carried. <br />2 <br /> <br />