Laserfiche WebLink
2010 — 2019 Capital Investment Plan <br />Item: Street Lighting Division: Public Works <br />Year: 2010 - 2019 Cost: $70,000 <br />Status: Unfunded <br />Description: <br />City-owned street light poles will require replacement at the end of their useful lives. Poles <br />along the Prior/Perimeter Drive and Co Road B2 Bridge segments have been identified as being <br />in need of replacement. <br />Justification: <br />See above description. <br />lding Sources <br />Property taYes <br />Other <br />Total Sources <br />capital <br />otner <br />Total ] <br />2011 , 2012 2013 2014 2015-2019 <br />�----- <br />� �, � � � � ���� <br />0����� <br />� �, � � � � ���� <br />� �, � � � � ��� <br />a���� <br />C � ! . � .7 � t i T i T � 7 � � � � � � <br />erations and Maintenance Costs <br />Fundin Sources <br />Pro ert taxes $ - $ - $ - $ - $ - <br />OtheY - - - - - <br />TotalSources $- $- $- $- $- <br />E�enditures <br />Other $- $- $- $- $- <br />Total Ex enditures $ - $ - $ - $ - $ - <br />** No operational costs are shown. There is no significant change in operational costs. <br />C� <br />� <br />� <br />.n - <br />$- <br />� <br />� <br />51 <br />61 of 81 <br />