Laserfiche WebLink
2010 — 2019 Capital Investment Plan <br />Item: Water Storage Tank Division: Public Works <br />Year: 2011 Cost: $500,000 <br />Status: $500,000 available (projected) <br />Description: <br />The City's water storage tank was rehabilitated in 1995. Recent inspections indicate a need to <br />repaint the structure to preserve the underlying metal and increase longevity. Repainting will <br />also improve the tower's aesthetics. <br />Justification: <br />See above <br />iding Sources <br />LTtility Fees <br />otner <br />Total Sources <br />Capital replacement <br />otner <br />Total Exnenditures <br />Canital Costs <br />$ - $ 500,000 <br />$ - $ 500,000 <br />$ - $ 500,000 <br />$ - $ 500.000 <br />�� <br />a� <br />�� <br />�- <br />�- <br />�� <br />a� <br />��� <br />erations and Maintenance Costs <br />Fundin Sources <br />Utilit Fees $ - $ - $ - $ - $ - <br />Other - - - - - <br />TotalSources $- $- $- $- $- <br />E�enditures <br />Other $- $- $- $- $- <br />Total Ex enditures $ - $ - $ - $ - $ - <br />** No operational costs are shown. There is no significant in operational costs. <br />�� <br />e� <br />�� <br />�- <br />�- <br />�� <br />a� <br />��� <br />e� <br />� <br />� <br />.n - <br />$- <br />59 <br />69 of 81 <br />