My WebLink
|
Help
|
About
|
Sign Out
Home
1995-01-26_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1995
>
1995-01-26_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 3:56:10 PM
Creation date
4/12/2010 3:01:51 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/26/1995
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Grass Lake WO <br />Lake Planning -Phase II and Phase III <br />Draft Scope of Work. <br />xhibit.A <br />December 5, 1994 <br />Phase II -Analysis <br />A. Collect additional. available information. <br />B. Prepare base-level trends analysis. <br />1. Secchi transparency/eutrophication trend analysis <br />2. Background phosphorus level calculation <br />3. Phosphorus level computer model prediction <br />~. Ecoregion nutrient level comparison <br />5. XP-SWMM data summary <br />C Conduct Technical Advisory Group meeting to revie~~~ Diagnostic Feasibilit}• Stud~• <br />recommendations and trend analysis. <br />D. Develop consensus on remaining feasible BMP projects in the watershed. <br />E. Establish preliminary total phosphorus level goal for three lakes. <br />F. Develop scope for report phase. <br />Phase III -Report <br />A. Final revie~ti• meeting with Technical Advisory Group to rescope future activities. <br />B. Formalize lake ~ti~ater qualit~~ goals and recreational objectives. <br />C Develop lake management report format. <br />D. Prepare report to GLWMO Board. <br />E. Receive authorization to proceed with subsequent phases as necessary. <br />1. Phase IV -Monitoring <br />2. Phase V -Lake Management Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.