Laserfiche WebLink
PART II. -PROJECTS Y <br />Catch Basin Sediment Filter Bag Test Project <br />This is a cooperative project between the City of Roseville and School District 623. <br />Dalgren, Shardlow and Uban are the development consultants hired by School District <br />623 to represent the District's interests in this matter. The purpose of this project is to <br />test the usefulness of a newly patented sediment retention device (U.S Patent No. <br />5372714) called the "Siltsack" for application as a BMP in Minnesota cities during <br />residential construction. The device is designed to be installed in newly installed catch <br />basins in curb and gutter applications to serve as a secondary treatment measure to <br />compliment primary site erosion control measures. The Siltsack is made of durable <br />nylon fabric and is designed to filter out sediment that enters a typical storm sewer catch <br />basin. It is available in two flow capacities, 200 gpm and 40 gpm. The manufacturer <br />claims that it has been used as a primary erosion control measure for some applications <br />and as a long term BMP practice in some envronmenatally sensitive areas. The product <br />has many potential beneficial attributes but has not been tested in the midwest to date. <br />They include: <br />1. If properly maintained, it may prevent the need of having to do remove sediment <br />deltas at discharge sites in wetlands and lakes that are difficult to maintain. <br />2. It provides an effective method of reducing sedimentation caused by new <br />developments at the critical stage between when the curb and gutter is installed <br />and when all the contributing watershed is not stabilized by permanent erosion <br />control. <br />3. It affords easy access from the street using a backhoe. <br />4. Silt collected could be disposed of at the most probable nearby area that is the <br />source of the sediment for areas under construction. <br />5. The product has possibilities of collecting sediment from street sanding and leaf <br />litter during winter and spring runoff in small watershed areas that are <br />environmentally sensitive. <br />The project would be applied and tested over a two year period during the development <br />of a 77.5 acre residential development Independent School District No. 623 will be <br />constructing during the 1995 and 1996 construction seasons. The school district would <br />install the sacks. Inspection and maintenance responsibilities would be shared between <br />the city and the school district on a mutually agreeable schedule. Expected outcomes <br />include the following: <br />A. A practical critique from the perspective of a city engineering department and a <br />developer on the value of the product as an erosion control BMP for urban areas <br />of Minnesota. <br />