Laserfiche WebLink
Advocating regional economic, societal and environmental issues and solutions <br />April 10, 1995 <br />Karl Keel <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville MN 55113 <br />RE: American Legion Park Pond <br />Environmental Assessment Worksheet (EAW) <br />Metropolitan Council District No. 11 <br />Dear Mr. Keel: <br />Council staff has reviewed this environmental assessment worksheet to determine its adequacy and accuracy in <br />addressing regional concerns. The staff review concludes that the EAW is complete and accurate and raises no major <br />issues of consistency with Council policies. An EIS is not necessary for regional purposes. <br />The EAW proposes to dredge approximately 10,500 cubic yards of material from an unnamed, state protected Weiland <br />(62-208W) to create atwo-cell NURP treatment pond for Lake Owasso in the city of Roseville. The project affects <br />approximately 1.6 acres of the 11.9 acre wetland. The wetland is currently ditched with very little open water. The <br />Cowardin Classification for the wetland is PSS 1 Cd; palustrine, broad leaf deciduous scrub shrub, seasonally flooded, <br />ditched. <br />Metropolitan Council policy seeks to preserve all protected and unprotected watercourses including associated. wetlands, <br />to enhance water quantity and quality and to preserve their ecological functions. However, in this instance the wetland is <br />ditched and of relatively low value. Construction of a water quality treatment pond would help to preserve the current <br />water quality of Lake Owasso, and perhaps improve it. <br />Lake Owasso has been designated as a priority lake by the Metropolitan Council because of its significance as an <br />important regional resource. Council staff believes that the proposed facility would be of more value to Lake Owasso <br />than the current wetland, especially since the pond would not occupy the entire wetland area. The location of the <br />proposed project is in a relatively developed area, and alternate sites would be more expensive and would not provide <br />control of all inflows. In summary, this project represents a compromise that is consistent with our policies. The <br />proliosers should work with L're Department of Natural Resources t~ minimize adverse impacts to the wetland. <br />This concludes the Council's re~lew of the EAW and no formal action will be taken by the Council. If you have any <br />questions, please contact Jce Mulcahy, Water Management Unit, at 291-6652. <br />Sincerely, <br />~~ ~ ,~,1%~-T- <br />.- ~ - ~. <br />Chuck Ballentine, <br />Office of Local Assistance <br />CB:veb <br />cc: Esther Newc;ome, Metropolitan Council District 11 <br />Lynda Voge, Joe Mulcahy, Victoria Boers, Metropolitan Council Stafl~ <br />Mears Park Centre 230 East Fifth Street <br />Recycled Paper <br />St. Paul, Minnesota 55101-1634 612 291-6359 Fax 291-6550 TDD 291-0904 <br />An Equal Opportunity Employer <br />