Laserfiche WebLink
GRASS WATER AGE NT ORGA TION <br />AGENDA ITEM <br />Date: 4/27/95 Prepared b j~ Karl P. Keel Item: A-2 <br />1 ~L Organizational Items <br />Item Description: Staff reports on pending matters <br />-New developments/projects within Roseville affecting the GLWMO: <br />a. School district redevelopment at Owasso/Western/Dale <br />Following a presentation by representatives of the school district, the GLWMO <br />Board, at its January 30, 1995, meeting, passed a resolution. forwarding the following <br />comments to the City of Roseville Planning Commission and City Council.. <br />Comments regarding current status follow each item. <br />(1) The potential pumping from Wetland Basin 5 should be analyzed with <br />regard to flooding on Lake Owasso. Some properties, especially on Sandy <br />Hook Drive, are very susceptible to high. water levels on Lake Owasso. <br />The pumped outlet to Lake Owasso is currently being routed to the east to a <br />large DNR protected wetland at the corner of Western Avenue and South <br />Owasso Boulevard. This wetland drains easterly underneath South. Owasso <br />Boulevard to the large .wetland in Lady Slipper Park. This wetland is directly <br />connected to Lake Owasso. The rate of discharge to Lake Owasso is very small <br />compared to the total discharge to Lake Owasso. This additional discharge will <br />have a negligible effect on high water levels in Lake Owasso. By routing the <br />stormwater through an additional ponding system, the direct impacts to Lake <br />Owasso will be further minimized. <br />(2) The Board commended the school district for the proposed treatment of <br />on-site run-off and encouraged the district to provide treatment for off-site <br />drainage wherever feasibly possible. <br />The current school district plans show some sort of treatment for all the <br />stormwater generated on or entering the site. All the on-site drainage is routed <br />through a minimum of one NURP basin. The off-site drainage west of Dale <br />Street will be treated in a newly constructed grid chamber prior to its discharge <br />into the existing wetland. <br />