Laserfiche WebLink
Use this sheet to determine your permit application fee if the project will be in DNR protected waters or <br />wetlands. Fees must be paid with a check or monk order payable to the "Department of Natural Resources". <br />Cash cannot be accepted. <br />Fee for the construction or repair of a dam ......................................... $75.00 <br />(Under Minnesota's Dam Safery Rules, M.R. 6115.0300-6115.0520) <br />Fee for the placement of riprap shore protection ..................................... $75.00 <br />(or place fill to recover shoreland lost to erosion) <br />Fee for all other projects .................................... ......... See Below* <br />~. <br />Minimum Fee: .......................................... A) $75.00 <br />Project Cost: $ ~~ ~O x 1 °k = ............................. B) $ ~~ <br />Length of Shoreline Affected: <br />feet x 75 cents per foot = ....................... C) $ <br />(For channel excavation projects, the shoreline affected is the difference <br />in length between the existing channel and the new channel.) <br />Volume of Material Filled r Excavated: <br />CO~~O cubic y cents per cubic yard = ................. D) $~?j`~ <br />(For channel excavation projects, the volume is only <br />the material filled or excavated in protected waters.) <br />Maximum Fee: ......................................... E) $500.00 <br />*DETERNffNE YOUR FEE AS FOLLOWS: <br />- If B, C, and D are all less than $75 ......................... the fee is $75. <br />- If B, C or D is more than $75 but less than $500, <br />the fee is the lamest amount of B, C, or D. <br />- If B, C. or D is more than $500 .......... . .............. the fee is $500. <br />-- _ . <br />- If you represent a Township applying for a road, <br />bridge, or culvert project . ......................the maximum fee is $100. <br />- NOTICE - <br />If a DNR permit is required for the work proposed, your application will not be processed unless the appropriate fee <br />is submitted. Applications sent with no fee or an inadequate fee will be considered withdrawn after 30 days and no <br />further action will be taken. The permit application fee for work partially or wholly completed prior to this permit <br />application is double the normal fee; if a field inspection is also required, the application fee will be double plus the <br />actual cost of the field inspection (not less than $100). <br />ALL FEES ARE NONREFUNDABLE <br />" Printed on Recycled Paper <br />This information is available in on alternative format upon request. Contains lo~postcor~s~rnerwa~e <br />©1994 State of Minnesota, Department of Natural (resources <br />