Laserfiche WebLink
V111 <br />Comprehensive Storm Water <br />Management Including <br />Wetlands: <br />Determination <br />of Project <br />Acceptability <br />VI. BMP Selection <br />- Avoidance =the best BMP <br />- Appropriate BMP selection <br />- Cost and treatment <br />effectiveness for specific <br />projects <br />. Functions and Values <br />- Determine direct and secondary impacts <br />- Quantify the changed functions and values <br />- Develop appropriate mitigation for lost <br />values <br />. Wetland Susce tip bility <br />Locate and Describe <br />Wetlands by Sensitivity <br />group, including: <br />- Dominant and subdominant <br />species. <br />-Outstanding resources or <br />II. Hydrologic Analysis <br />-Analyzing of hydrologic <br />changes that could affect <br />magnitude, frequency and <br />duration of inundation. <br />-Flood and drainage routing <br />for all azeas. Small storm <br />hydrology for sensitive <br />azeas and pollutant loadings. <br /> <br />III. Water uality Impacts <br />- Analyze sources for <br />parameter of concern, <br />i.e. solids, nutrients, <br />toxics, aesthetics <br />- Utilize small storm <br />hydrology for loading <br />__ and water level <br />problems. <br />- Allowable hydroperiod <br />changes orexceedances <br />