My WebLink
|
Help
|
About
|
Sign Out
Home
1996-02-01_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1996
>
1996-02-01_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 3:57:08 PM
Creation date
4/12/2010 3:43:48 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/1/1996
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GRASS LAKE WATER MANAGEMENT ORGANIZATION <br />. AGENDA ITEM <br />.Date: 2/1/96 -Prepared by: Karl .Keel 'Item:' A-6 <br />Organizational Items <br />Item Description; Staff reports on pending matters: <br />1. New developments/projects within Roseville affecting the GLWMO: <br />a. School district redevelopment-Owasso/Western/Dale <br />With `the exception of the final lift of asphalt, the majority of the roadway and utility <br />work has been completed. New homes continue to be constructed throughout the` <br />winter. Special care will betaken during the spring thaw to ensure that soils disturbed <br />during the winter are stabilized and erosion is minimized. <br />b. Kettler Development-County Road C/Dale Street <br />This development consists of the construction of two short public cul-de-sacs to serve <br />new townfiomes to be constructed on the southwest corner of County Road `C and <br />Dale Street:: The approved plan includes two NIJRP stormwater basins to address <br />-both water duality and water duantity issues. Construction has begun on the model <br />adjacent to-Dale Street.. It is expected that roadway and utility construction will begin <br />early in May 1996: Plans will include provisions for erosion control. <br />c. Acorn Park re~radin~ <br />As part of Roseville's park improvement program; a large portion of Acorn Park will <br />` be redeveloped. This redevelopment`includessite regrading, construction of new <br />bituminous and boardwalk trails, new parking facilities, and anew ball field. Acorn <br />Park' is located between Rice Street and Western Avenue south of County Road C <br />Work will resume in approximately May 1996 and be completed by late fall 1996. All <br />construction plans will include provisions for erosion control." <br />d. Roseville street reconstruction` <br />As part of it annual Pavement Management Program, the City: of Roseville will <br />reconstruct approximately 4.5 miles of roadway in 1996. The -only roadway, <br />construction within GLWMO is Transit Avenue just east of Dale Street. This short <br />
The URL can be used to link to this page
Your browser does not support the video tag.