My WebLink
|
Help
|
About
|
Sign Out
Home
1996-04-25_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1996
>
1996-04-25_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 4:00:38 PM
Creation date
4/12/2010 3:49:56 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/25/1996
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.a <br />"" Department of NA-02659-03 <br />Natural Resources <br />~`~'~ ~Oivision of waters Rev. 3/94 <br />DEPARTMENT OF NATURAL RESOI~"RCES WATER PERMIT APPLICATION FEES <br />Use this sheet to determine your permit application fee if the project will be in DNR protected waters or <br />wetlands. Fees must be paid with a check or money order payable to the "Department of Natural Resources". <br />Cash cannot be accepted. <br />Fee for the construction or repair of a dam ......................................... $75.00 <br />(Under Minnesota's Dam Safety Rules, M.R. 6115.0300-6115.0520) <br />Fee for the placement of riprap shore protection ............... . .............. . ...... $75.00 <br />(or place fill to recover shoreland lost to erosion) <br />Fee for all other projects .............................................. See Below* <br />Minimum Fee: .......................................... A) $75.00 <br />Project Cost: $ 5 3, g 0 S. 0 0 x l%_ .... .... .................... B) $ 5 3 8. 0 5 <br />Length of Shoreline Affected: <br />2 0 feet x 75 cents per foot = .. .. ... C} $ 15.0 0 <br />(For channel excavation projects, the shoreline affected is the difference <br />in length between the existing channel and the new channel.) <br />Volume of Material Filled. or Excavated: <br />cubic yards x 75 cents per cubic yard = ....... . ......... D) $ 0 <br />(For channel excavation projects, the volume is only <br />the material tilled or excavated in protected waters.) <br />Maximum Fee: . . . ..... . ...................... . ....... . . E) $504.00 <br />'DETERMINE YOUR FEE AS FOLLOdVS: <br />- If B, C, and D are all less than $75 ......................... the fee is X75. <br />- If B, C or D is more than $75 but less than $500, <br />the fee is the largest amount of B, C, or D. <br />- If B, C, or D is more than $500 .......................... the fee is $500. <br />- If you represent a Township applying for a road, <br />bridge, or culvert project . ................... . .. the maximum fee is $100. <br />--- NOTICE --- <br />If a DNR permit is required for the work proposed, your application will not be processed unless the appropriate fee <br />is submitted. Applications sent with no fee or an inadequate fee will be considered withdrawn after 30 days and no <br />further action will be taken. The permit application fee for work partially or wholly completed prior to this permit <br />application is double the normal fee; if a field inspection is also required, the application fee will be double plus the <br />actual cost of the field inspection (not less than $100). <br />ALL FEES ARE NONREFUNDABLE <br />This information is available in an alternative format upon request. Printed on Recycled Paper <br />Contains 10%postcons>,~rwaste <br />©1994 State of Minnesota, Department of Natural Resources <br />
The URL can be used to link to this page
Your browser does not support the video tag.