Laserfiche WebLink
.a <br />"" Department of NA-02659-03 <br />Natural Resources <br />~`~'~ ~Oivision of waters Rev. 3/94 <br />DEPARTMENT OF NATURAL RESOI~"RCES WATER PERMIT APPLICATION FEES <br />Use this sheet to determine your permit application fee if the project will be in DNR protected waters or <br />wetlands. Fees must be paid with a check or money order payable to the "Department of Natural Resources". <br />Cash cannot be accepted. <br />Fee for the construction or repair of a dam ......................................... $75.00 <br />(Under Minnesota's Dam Safety Rules, M.R. 6115.0300-6115.0520) <br />Fee for the placement of riprap shore protection ............... . .............. . ...... $75.00 <br />(or place fill to recover shoreland lost to erosion) <br />Fee for all other projects .............................................. See Below* <br />Minimum Fee: .......................................... A) $75.00 <br />Project Cost: $ 5 3, g 0 S. 0 0 x l%_ .... .... .................... B) $ 5 3 8. 0 5 <br />Length of Shoreline Affected: <br />2 0 feet x 75 cents per foot = .. .. ... C} $ 15.0 0 <br />(For channel excavation projects, the shoreline affected is the difference <br />in length between the existing channel and the new channel.) <br />Volume of Material Filled. or Excavated: <br />cubic yards x 75 cents per cubic yard = ....... . ......... D) $ 0 <br />(For channel excavation projects, the volume is only <br />the material tilled or excavated in protected waters.) <br />Maximum Fee: . . . ..... . ...................... . ....... . . E) $504.00 <br />'DETERMINE YOUR FEE AS FOLLOdVS: <br />- If B, C, and D are all less than $75 ......................... the fee is X75. <br />- If B, C or D is more than $75 but less than $500, <br />the fee is the largest amount of B, C, or D. <br />- If B, C, or D is more than $500 .......................... the fee is $500. <br />- If you represent a Township applying for a road, <br />bridge, or culvert project . ................... . .. the maximum fee is $100. <br />--- NOTICE --- <br />If a DNR permit is required for the work proposed, your application will not be processed unless the appropriate fee <br />is submitted. Applications sent with no fee or an inadequate fee will be considered withdrawn after 30 days and no <br />further action will be taken. The permit application fee for work partially or wholly completed prior to this permit <br />application is double the normal fee; if a field inspection is also required, the application fee will be double plus the <br />actual cost of the field inspection (not less than $100). <br />ALL FEES ARE NONREFUNDABLE <br />This information is available in an alternative format upon request. Printed on Recycled Paper <br />Contains 10%postcons>,~rwaste <br />©1994 State of Minnesota, Department of Natural Resources <br />