Laserfiche WebLink
WCA ROAD REPLACEMENT REPORT -FINAL <br />YEAR: <br />PROJECT NAME OR NUMBER: <br />PROJECT TYPE: repair .rehabilitation reconstruction <br />LOCATION (attach map): <br />COUNTY: <br />ROAD AUTIiORITY NAME: <br />CONTACT PERSON: PHONE #: _ <br />TOTAL ESTIMATED WETLAND ACRES IMPACTED: <br />replacement <br />Y N 1.) WETLAND AVOIDANCE CHECKLIST (describe in item 4) COMMENTS <br /> Was the project relocated to avoid wetlands? <br /> Was the project reduced in scope to avoid wetlands? <br /> Did the project jeopardize or adversely effect endangered species? <br /> Did the project adversely affect cultural resources (SHPO)? <br /> Did the project. deviate from state and federal design standards to avoid wetlands? <br /> <br />Y N 2.) WETLAND MINIMIZATION CHECKLIST (describe in item 4) COMMENTS <br /> Was the project relocated to minimize impacts? <br /> Was the project reduced in scope to minimize imacts? <br /> Did the project incorporate best management practices to reduce impacts? <br /> Did the project include erosion control. and turf establishment plans? <br /> <br />Y N 3.) WETLAND MITIGATION CHECKLIST {describe in item 4) COMMENTS <br /> Will the project affect important wetland functions that require on-site replacement? <br /> Did the project have on-site replacement opportunities? <br /> Did the project have any replacement opportunities near by? <br /> Was some accomplished on-site or near by? <br /> Was all mitigation done off-site by a wetland bank (restoration)? <br />4.) DESRIPTION OP SEQUENCING (include attachment if needed): <br />~.) T.E.P. REVIEW: YES NO <br />