My WebLink
|
Help
|
About
|
Sign Out
Home
1996-07-25_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1996
>
1996-07-25_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 4:22:15 PM
Creation date
4/12/2010 4:05:01 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/25/1996
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA ROAD REPLACEMENT REPORT -PROJECTIONS <br />YEAR: <br />PROJECT NAME OR NUMBER: <br />PROJECT TYPE: repair rehabilitation reconstruction <br />LOCATION (attach map): <br />COUNTY: <br />ROAD AUTHORITY NAME: <br />CONTACT PERSON: PHONE #: <br />PROJECTED TOTAL WETLAND ACRES TO BE IMPACTED: <br />replacement <br />Y N 1.) WETLAND AVOIDANCE CHECKLIST (describe in item 4) COMMENTS <br /> Can the project be relocated to avoid wetlands? <br />~ ~ ~ ~an the project be reduced m scope to avoid wetlands? ~ ~ <br />Will the project jeopardize or adversely effect endangered species? I ---~ <br />L I ~ Will the project adversely affect cultural resources (SHPO)? ~ --~ <br />Is it practical and reasonable to deviate from state or federal design standards to <br />avoid wetlands? <br />Y N 2.) WETLAND MINIMIZATION CHECKLIST (describe in item 4) COMMENTS <br />Can project be relocated to minimize impacts? <br />Can project be reduced in scope to minimize imacts? <br />Does the project incorporate best management practices to reduce impacts? <br />Does the project include erosion control and turf establishment plans? <br />Y N 3.) WETLAND MITIGATION CHECKLIST (describe in item 4) COMMENTS <br />Will the project affect important wetland functions that require on-site replacement? <br />Does the project have on-site replacement opportunities? <br />Does the project have any replacement opportunities near by? <br />Will some replacement be accomplished on-site or near bv? <br />Wil] all mitigation be done off-site via the state wetland bank? <br />4.) DESRIPTION OF SEQUENCING: (include attachment if needed) <br />~.) T.E.P. REVIEW: Completed Expected Not Expected <br />6.) OTHER REVIEWERS (list): <br />
The URL can be used to link to this page
Your browser does not support the video tag.