Laserfiche WebLink
aterials <br />Participants and Time Required <br />° Three people per storm drain. <br />° Fifteen minutes per drain. It will take less <br />time once you become familiar with the <br />procedure. <br />Supervision <br />~Ve recommend at least four or five chap- <br />erones per thirty youths, and at least one <br />supervisor with any group. <br />Weather Conditions <br />° It must be at least 50° F outside to insure <br />paint will dry-. <br />• No rain; dry pavement. <br />° Stenclls. CCMR will provide them. <br />° White or yellow water based masonry <br />paint that meets tifinnesota State stand- <br />ards. In some cases, the CCMR •.vill <br />provide the paint. <br />° Trash bags. <br />° Old clothing to wear. <br />° Broom. <br />° Paint rollers and trays. <br />° 2" brushes. <br />• Vehicles to transport materials. <br />To obtain stencils, contact: <br />Friends of the <br />Minnesota Valley <br />(612) 854-5900 <br /> <br /> - <br />~~ - ~~ ~ - <br />~ .. ~- _ <br />