My WebLink
|
Help
|
About
|
Sign Out
Home
1999-09-16_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1999
>
1999-09-16_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2010 3:25:16 PM
Creation date
4/13/2010 2:28:09 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/16/1999
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 22, 1999 GLWMO Meeting Minutes <br />Page 2 <br />5. Minnesota Board of Water ~i Soil Resources, Preliminary Agenda for June 23, 1999 meeting. <br />6. 'The State of Watershed -Water-Quality Management in Minnesota, July 13, 1999 <br />B-2 The Board reviewed the following correspondence sent by the GLWMO since the <br />meeting of April 22, 1999: <br />None <br />C. P®RTS <br />C-1 Water Management Planning -Review of Barr Work Plan <br />The Board discussed the components of the Work Plan prepared by Barr Engineering <br />Company. Generally, it was felt that there was little that could be eliminated from the <br />proposed work plan without negatively impacting the overall quality of the 2~ generation plan. <br />The Board was sensitive to the difference between the current cost estimate, $114,425 and the <br />approved budget amount of $80,000 and directed staff to investigate additional funding sources. <br />Phil Belfiori, a staff member with BWSR, was in attendance and offered insight into BWSR <br />grant opportunities and observations of the proposed work plan. <br />Denny Palmer, Barr Engineering Company, expressed a desire to begin Task 1.0 -Water <br />bodies and wetlands noting that the discussions to date supported this task. <br />Soderbeck moved to direct Barr Engineering to proceed with Task 1.0 -Water bodies and <br />wetlands, Stark seconded. Ayes: 4 Nays: 0 <br />D. J® 1VT <br />Soderbeck moved that a special Board meeting be scheduled for September 16, 1999 at 5:00 p.m. for <br />the purpose of reviewing the remaining work plan tasks, Landwehr seconded. Ayes: 4 Nays: 0 <br />Soderbeck moved the meeting be adjourned at 7:05 p.m. Roessler seconded. <br />Ayes: 4 Nays: 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.