Laserfiche WebLink
DEPARTMENT OF Y~TLR~L RESOURCES <br />Water Appropriation General Permit Notification Form <br />General Permit 97-0005 requires that the Area Hydrologist be notified five days before the start of water appropriations. <br />Please fill in the items listed below and fax or mail this form to the Area Hydrologist (see back of form) for the county in <br />which the water appropriation is located. This notification form is only for temporary appropriations authorized by <br />General Permit 97-0005. <br />Applicant Name: <br />Address: <br />Telephone: - <br />(Area Code) <br />FAX: - <br />(AreaCode) <br />Purpose: [ ]Construction Dewatering [ ]Hydrostatic Testing of Pipelines or Tanks <br />[ ]Landscaping or Dust Control [ ]Hydrostatic Testing of Wastewater Ponds <br />Project Description (including depth of wells, dewatering depth, well size, etc...): <br />Source of Water: <br />[ ]Well(s), if so how many? _ [ ]Water Truck [ ]Pump(s) [ ] <br />Land Access Authorization to Source: [ ]Construction Easement [ ]Landowner Permission (provide info below) <br />Land Owner Name:_ <br />Land Owner Address: <br />Point of Taking: <br />Contact Person: <br />County <br />1/4 1/4 t/4, Section ,Township ,Range <br />Estimated Pumping Rate: gallons per minute <br />Estimated Total'Volume to be Appropriated: <br />Start of Pumping (date): <br />End of Pumping (date): <br />Point of discharge for construction dewatering and hydrostatic testing water: <br />gallons <br />1/4 1/4 1/4, Section ,Township ,Range <br />Name of Receiving Water:. <br />Land Access Authorization. to Discharge: [ ]Construction Easement [ ]Landowner Permission (provide info below) <br />Land Owner Name:_ <br />Land Owner Address: <br />Phone #: <br />Phone #: <br />By signing below I certify the information submitted is true and correct to the best of my knowledge. <br />pp tcant tgnature <br />Date: / / <br />Date: / / <br />rea y ro ogtst ut ortzation <br />FAX or mail this form, a map showing the pumping and discharge sites, and any other supporting information to <br />the Area Hydrologist at Least five days before the start of pumping. Failure to provide information requested <br />in this notification form can delay approval under the general permit. <br />