Laserfiche WebLink
$ _. - <br />Page 2 <br />Item Description: Proposed 2002 Budget (continued from 10/25/01 meeting) <br />.:.Grass Lake <br />Water quality monitoring. $500 <br />Infrastructure survey $3,000 <br />Charlie Pond <br />Maintain outlet $500 <br />Remove accumulated. sediment, $10,000 <br />.every five years <br />The following budget is proposed to include these items:. <br />.Proposed 2002 General Administrative Budget <br /> 2001 <br />Budget 2001 <br />Actual Proposed <br />2002 Budget <br />General Cit Su ort $6,000 $3,199 $7,000. <br />Attorne $500 $0 $500' <br />Ramsey County Testing $6,000 $0 $6,500.. <br />Engineering Consultant $5,000 $1,600 $5,000 <br />Public Educ./Mailings $1,000 $0 $2,000 <br />TOTAL: $18,500 $4,799 $21,000 <br />The main project for 2001 was the preparation of the 2na Generation Plan. Most consultant costs <br />were assigned to the 2nd. Generation Plan project. Costs for ongoing services and minor <br />modifications to the GLWMO Agency Report Card are reflected in Consultant budget noted <br />above. <br />