Laserfiche WebLink
DR General Permit Year: <br />Report of Water Use General Permit 2000-6117 <br />Temporary Basin Dewatering <br />Contact Information <br />Contact Person <br />Company Name: <br />Address: <br />Phone: <br />Location <br />County: Township: Range: Section(s): <br />Project Name <br />and Description <br />Method of Withdrawal: <br />(describe number of <br />wells, type and depth) <br />Discharges To: <br />Pumping: Report number of gallons withdrawn this calendar year by month <br />January July <br />February August <br />March September <br />April October <br />~Aa;i Nn~iarphar <br />June December <br /> Year Total <br />Measurement Method:. Please indicate the method used <br />^ 1. Flow Meter <br />^ 2. Flow Rate Meter with: ^ Totalizer ^ Hour Meter <br />^ 3. Timing Device: ^ Electric Meter ^ Hour Meter , <br />^ 4. Approved Alternate Method: (describe) If not already approved, request approval <br />^ 5. Estimated: (describe) (An approved measuring method is required) <br />Fees: check one <br />Projects pumping less than 15 million gallons per year ^ none <br />Projects pumping surface water to reduce flooding ^ none <br />Projects pumping 15 million to 50 million gallons per year ^ $101 <br />Return after the project is completed, but no later than February 15th of the year after the appropriation occurs. <br />A report is required for each calendar year of pumping activity. <br />Make checks payable to DNR-Waters, and mail to: If you have any questions concerning reporting, <br />DNR -Waters please call (651} 259-5678 <br />500 Lafayette Rd Box 32 You can also leave a message after hours. <br />St. Paul, MN 55155-4032 <br />Signature Date <br />