I <br />3.3 Preferred Alternative <br />3.3.1 Roadway and Trail <br />-1 The preferred roadway and trail alignment is shown on Figure 4. This design <br />includes the avoidance and minimization measures described in Section 3.2.1 <br />above. This minimizes wetland impacts to the isolated basin to 914 square <br />feet. <br />' 3.3.2 Water Quality Improvements <br />Although realignment of the roadway further minimized opportunities to <br />~? provide pretreatment of runoff in the area south of South Owasso Boulevard, <br />it provided the opportunity to provide pretreatment in the area of the vacated <br />road bed. This allows upland area for a pond that will be of sufficient size <br />and orientation to provide pretreatment of runoff from the majority of the <br />:'' contributing watershed area. The large contributing area and the distance and <br />grades between the three primary discharge points necessitates construction <br />-! of secondary treatment ponds to provide effective pretreatment prior to <br />_' discharge into the wetland area. <br />As described in Section 2 above, the proposed project includes construction <br />of three ponds or cells as shown on Figure 4. Cell 1 is located on the bed of <br />_ the existing roadway, outside of the wetland area. Cell 1 will provide pre- <br />treatment of runoff from the 104-acre portion of the 126-acre contributing <br />area to the south. prior to discharge into the other proposed treatment cell and <br />the adjacent wetland area. Pretreatment in this upland area also minimizes <br />the area of wetland impact from the proposed secondary treatment cells. <br />Treated runoff from Cell 1 overflows into Cell 2, which also receives runoff <br />from the 10 acres of residential area west of Farrington Street (Figure 3) and <br />outflow from the stormwater pond to the north on South Owasso Boulevard. <br />This existing discharge at Famngton Street will be directed into the western <br />end of Cell 2. The majority of the area of Cell 2 is excavated within the <br />wetland area and will impact 0.63 acres of wetland. However, wetland <br />impacts have been minimized by locating the pond in the area of the existing <br />excavated channel to the greatest extent possible. Outflow from Cell 2 will <br />be directed over the northern edge of the excavated cell into the adjacent <br />wetland, by sheet flow, instead of continuing the more discrete flow of the <br />existing channel to Lake Owasso. <br />Cell 3 will receive runoff from the 12 acres of residential area that currently <br />J discharges into the wetland at .Marion Street. This third cell is located <br />completely within the wetland area and will impact 0.28 acres of wetland. <br />_ However, wetland impacts have been minimized by locating the pond in the <br />area of the existing excavated channel, as shown on Figure 4, to minimize <br />impacts to the adjacent, vegetated areas of the wetland. <br />4.0 Wetlands <br />Wetlands are defined jointly by the U.S. Army Corps of Engineers (USAGE) <br />and the U:S. Environmental Protection Agency (EPA) as follows: "Those <br />areas that are inundated or saturated by surface or ground water at a <br />- frequency and duration sufficient to support, and that under normal <br />circumstances do support, a prevalence of vegetation typically adapted for <br />Wetland Permit Application A-ROSEV0501.00 <br />- South Owasso Boulevard Water Quality Improvements Page 12 <br />