My WebLink
|
Help
|
About
|
Sign Out
Home
2006-10-26_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2006
>
2006-10-26_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2010 11:59:14 AM
Creation date
4/16/2010 11:37:18 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/26/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />ADDITION~4L CONDITIONS FOR TITLE REGISTERED PERMIT #2007-0083 <br />Sagarika Kanjilar <br />SIGN --- <br />DATED: ~~~ ~~o~ <br />17. Erosion control measures shall be adequately designed for the site characteristics. They may include staked haybales, <br />diversion channels, sediment ponds, or sediment fences. They shall be installed in accordance with "Ramsey County Erosion <br />and Sediment Control Handbook, Ramsey County Soil and Water Conservation District, October 1989" (and as revised in the <br />future), prior to commencement and maintained throughout. the project. All exposed soil shall be stabilized as soon as <br />possible and no later than 72 hours after the completion of the project. Topsoil should be used to re-dress disturbed soil <br />areas and indigenous plant species should be used to revegetate disturbed areas whenever possible. <br />18. Any work below the water level shall be encircled by a flotation sediment curtain to prevent sediment from being transported <br />beyond the construction site. This sediment curtain shall be constructed and maintained as illustrated on the enclosure <br />entitled "6.32 Treatment Measures: Flotation Silt Curtains." (Copy Enclosed) The barrier shall be removed upon completion <br />of the work after the silt has settled. <br />19. Upon completion of the authorized work, the Permittee shall submit representative photographs and any as-built surveys, as <br />appropriate, of the project area to DNR Metro Region Waters (1200 Warner Road, St. Paul, MN 55106). <br />20. The Permittee is authorized to maintain the approved work to the dimensions herein described. Prior to commencing any <br />maintenance work, the Permittee shall advise the Department of Natural Resources of the extent and method of maintenance. <br />Maintenance work shall not be commenced until Permittee receives written approval from the Department <br />21. No activity affecting the bed of the protected water may be conducted between April 1 and June 30, to minimize impacts on <br />fish spawning and migration. If work during this time is essential, it shall be done only upon written approval of the Area <br />Fisheries Manager, at 651-772-7950. <br />22. Structures shall be maintained in good condition. Any additions or reconstruction (rebuilding at a cost exceeding 50% of <br />replacement cost) of the structures must be authorized by amendment to this permit. <br />c: Landscape Junction Inc., Dave Fellon <br />City of Shoreview, Kathleen Nordine <br />Grass Lake WMO, Mark Maloney <br />Ramsey Conservation District, Tom Petersen <br />U.S. Corps of Engineers, Tim Fell <br />Lake Emily (62-80W) File <br />DNR Conservation Officer Brett Oberg <br />DNR Ecological Services, Wayne Barstad <br />DNR Fisheries, Dave Zappetillo <br />DNR Wildlife, Bryan Lueth <br />DNR Central Waters, Ron Anderson <br />
The URL can be used to link to this page
Your browser does not support the video tag.