Laserfiche WebLink
Board of Managers-Grass Lake Watershed Management Organization <br />c/o Mark J. Maloney <br />October 24, 2006 <br />Paee 2 <br />or refuted by computer simulation modeling of watershed runoff using the model P8, calibrated to <br />newly collected runoff data. Barr Engineering Co. staff have recently assisted Ramsey-Washington <br />Metro Watershed District staff in installing continuous flow gaging and stage-activated automatic <br />sampling equipment at three major inflow sites around Lake Owasso. Data from these sites will be <br />used for P8 model calibration purposes at the conclusion of the 2007 water year (1 Oct. 2006 to <br />30 September 2007). <br />I, and my associate, Scott Sobiech, will be at your next meeting on October 26`~ to review with you <br />our proposed project work, and will gladly answer any questions you have then. Thank you. <br />Sincerely, <br />BARR ENGINEERING CO. <br />/-l-m~,,r~~ <br />Henry M. (Hal) Runke, Ph.D. <br />Limnologist, Vice President <br />HMR/ymh <br />Enclosure(s) <br />c: M. Maloney <br />D. Schwartz <br />C. Aichinger <br />ODMA\PCDOCS\DOCS\247725\ 1 <br />