Laserfiche WebLink
Diagnostic/Feasibility Study using the Use Attainability Analysis Process for Lake Owasso <br />Itemized Cost for Scope of Services including Lake User Survey <br />Phase/Work Task and Description Staff Costs <br />(hours based) Staff Costs <br />(task based) Direct <br />Expenses Total for <br />Owasso <br />'tack 1: D~termino Current antl Historical yda...ter Quality Conditions <br />Gam ile and evaluate available historical VJQ monitorln data i <br />$33G <br />'y330 <br />Runoff Inflow Monitorin Performed b RWMWD staff $0 I $0 <br />Conduct in-lake WO data collection program (T. Noonan, Ramsey County Public Works <br />De t. $0 $0 <br />Review/Analyze zooplankton data (Dr. Joseph Shapiro, Emeritus Professor of Limnology - <br />lJniversity of Minnesota) $0 $1,000 $1,000 <br />Conduct trend anal ses of water ualit usin available historic and 2006 WO data $290 $290 <br />Review and evaluate existin macro h e data collected b RWMWD & Os ood $350 R35q <br />-Subtotal $7 020 $1,000 $2,020 <br /> <br />Task 2: Set Beneficial Us^_ Goals <br />Rcv;uw of existin we oafs and com orison with IviPCA criteria <br /> <br />$180 i <br /> <br />' 'i,1 °0 <br />Jieetin with WMO & Lake Association to discuss beneficial use oats $920 $0 ! ?:920 <br />Subtotal $1 100 SO $50 51,750 <br />Task 3. Assess attainmentor nonattainment for current watershed land•use conditions <br />:ompare current and historic water quality with established beneficial use goals <br />`x360 <br />~ _300 <br />Subtotal $350 $0 $0 5350 ', <br />Task 4: Estimate annual stormwater runoff and phosphorus budget to the lake <br />Review and evaluate storm water runoff monitorin data <br />$2,460 <br />j $2,460 <br />Review and evaluate available reci nation data $360 $360 <br />Develo H drolo is Modelin Parameters <br />Develo PB watershed divides $360 ( $360 <br />Create GIS land use covera a for ast conditions o tional) $0 I j $0 <br />Create GIS land use covera e for existin conditions $180 j $180 <br />Determine Direct/Indirect Im ervious Measurements ( $360 j j $360 <br />Determine soli t es and im acts of roundwater $540 i $540 <br />Calculate Watershed H drologic Characteristics for existing conditions $360 $360 <br />j <br />Develo Modelin Parameters for Treatment Ponds <br />Conduct field survey of approximately 14 ponds (pond depth, perimeters, outlet info, <br />overflow elev, etc $920 $500 $1,420 <br />Determine and volumes and outlet rating curves $1,660 $1,660 <br />Determine and network connectivit $90 $90 <br />Develo P8 Com uter Model <br />Develo P8 com uter model $1,910 $1,910 <br />PB Com uter Model calibration and debu ging $7,160 $7,160 <br />Subtotal $16 360 $0 $500 .$16,860 <br />Task 5: Reconcile the hydrologic and phosphorus budgets to observed in-lake conditions <br />using a lake water quality model <br />Collect and anal ze sediment core samples 5 Sediment Release, 10 for Mobile P) <br /> <br />$0 <br /> <br />$9,500 <br /> <br />$0 $9,500 <br />Develop and CalibrateNerify In-Lake Water Quality Model for Lake Owasso based on <br />current land use conditions $6,640 $6,840 <br />Develop In-Lake Water Quality Relationships between [TP], [Chi a], and SD for Lake <br />Owasso $370 i i $370 <br />Review Modeling Results $1,400 $1,400 <br />Subtotal $8 610 $9 500 $0 $18,710 <br />I <br />Task 6: Using the lake model, assess likelihood of beneficial use attainment under ultimate <br />watershed land usa conditions <br />Create GVS land use covera a for future eonddions <br /> <br /> <br />90 $90 <br />Determine Watershed H drolo is Characteristics for future conditions $540 $540 <br />Develo /run PB model for future conditions $720 j $720 <br />Use In-lake model to redid future in-lake conditions $1,060 I $1,060 <br />Com are modeling results with beneficial use goals $620 i $620 <br />Subtotal $3,050 j $0 $0 $3,05D <br />I ~ <br />Task 7: Recommend Feasible Alternative Remedial Measures <br />Identify Potential BMPs <br /> <br />$2,340 I <br /> <br />$2,340 <br />Develo /run P8 model for BMP alternatives $2,700 $2,700 <br />Subtotal $5,040 $0 $0 $5,040 <br /> <br />Task 8: Generate the Lake Owasso Diagnostic/Feasibility Study Report <br />Generate Review Draft Report and Figures for Lake Owasso ~ _ <br /> <br />$7,320 j <br /> <br />$500 $7,820 <br />Generate Final Draft Report and Figures for Lake Owasso $2,840 $500 $3,340 <br />Conduct Meetin with WMO about Draft Re ort $2,060 $50 $2,110 <br />Conduct Public Meetin with Lake Association about Draft Re ort $1,660 $50 j $1,710 <br />Conduct Joint Public Meeting with WMO and Lake Association about Final Re ort $1,640 $50 $1,690 <br />Subtotal $15,720 $0 $1 150 $16,870 <br />Task 9: Project htanagemen] g hl:sc. Correspondence <br />Project Management _ _. <br /> <br />Subtotal _ _.. _____ ___ <br />.u ,5,160 <br />a~ <br />55,100 _ ~_ SO_._ >0_ $5,160 <br />Subtotal $56,410 $9,500 52,700 $68,610 <br />Task 10: Conduct Lake User Survey <br />Summarize and Prepare Figure ILus[rating Historic BIJ,Fs and ImpVemenretio7 Date <br />Assumes Cities will Provide Locations and Dates <br />$1,7u0 a50 ~ $'~,a10 <br />Summarize and Prepare Figure Illustrating All Public and Private Direct Inflows to Lake <br />Owasso (Assumes Cities and Lake Association will Perform Field Work to Locate Inflows) $1,460 $50 $1,510 <br />Develop, Distribute and Summarize Survey of Lake Residents (assumes Cities will provide <br />distribution list $6,000 $200 I $6,200 <br />Subtotal $9,220 $300 $0 59,520 <br /> <br />Total 565,630 $9,800 $2,700 $78,130 <br />1/12/2007 <br />P:\wr\f 3\prp\2006\6069 -Lake Owasso\GLW MO UAA Ballpark Cost EsSmare.xls: OwassowithAddedW ork 3:24 PM <br />