Laserfiche WebLink
ZT <br />~:~ STATE OF <br />~~ ~~„~~~~~~~~Q <br />i --~ ®EPART~E~1T ®F ~TUR~L RES~~RCES <br />-- <br />DNR METRO WATERS - 1200 WARNER ROAD, ST. PAUL, MN 55106 <br />SHONE P10. .~.~ 2 -7 910 FILE NO. <br />March 31, 1994 <br />Mr. Karl Keel <br />City of Shoreview <br />4600 North Victoria Street <br />Shoreview, Minnesota 55126 <br />RE: TWO PERMITS: APPROPRIATION PERMIT NO. 94-6011 AND PROTECTED <br />WATERS PERMIT NO. 94-6010, SUCKER LAKE [62-28] (AND SNAIL LAKE <br />[62-73)), CITY OF SHOREVIEW, RAMSEY COUNTY <br />Dear Mr. Keel: <br />Enclosed is Appropriation Permit No. 94-601.1 authorizing the <br />appropriation of up to 250 million gallons per year of surface <br />water from Sucker Lake for augmentation of Snail Lake. The pumping <br />station is located in Section 19, Township 30 North, Range 22 West <br />and is authorized by the enclosed Protected Waters Permit No. 94- <br />6010. <br />Please read all permit conditions and limitations of both permits. <br />Please note in particular Special Provisions Numbers 5 and 6 of <br />Permit No. 94-6010, Wh1Ch require erosion and sediment control <br />measures to protect the quality of Sucker Lake. <br />As a condition of the appropriation permit you are required to <br />install a flow meter to record the monthly and total volumes of <br />water appropriated annually. A water use report will be sent to <br />you each 3anuary for reporting the amounts for the previous year. <br />The report must be submitted with a processing fee by February 15 <br />each year. Please refer to the rate schedule below to determine <br />your arnuai water use fee.. The report and fee must be submitted as <br />long as the permit is active, even if no water is used. Failure to <br />submit the water use report and fee can result in the termination <br />of your permit. Please do not send the report and fee until <br />notified. <br />RATE SCHEDULE FOR ANNUAL REPORT OF WATER USE FEES <br />The fees required with annual water use reports were changed by the <br />1990 Legislature. Fees are based on actual water use rather than <br />the permitted amount of water. The following rate schedule can be <br />used to determine water use fees. Please be sure to note any <br />maximum fee limits that may apply. <br />[Example: 234 million gallons appropriated is in the range 200 to <br />250 million gallons, requiring a fee of $2.50 for each million <br />gallons, therefore, the fee is $585.00 = $2.50 x 234.] <br />AEI F(ll ICI C1PP(1RTIINITY F~API CIYFR <br />