Laserfiche WebLink
~ Fee Schedule-2008 Rev. 01/01/08 <br />Rate4 <br />Description (dollars) <br />Principal Engineer/Scientist ............................................................................................................. $90-200 <br />Senior Consultants' ......................................................................................................................... $90-190 <br />Senior Engineer/Scientist' ............................................................................................................... $80-120 <br />, Engineer/Scientist' ............................................................................................................................ $55-90 <br />Computer Specialist ........................................................................................................................ $55-120 <br />Senior Technician2 .......................................................................................................................... $60-110 <br />TechnicianZ ........................................................................................................................................ $40-75 <br />Communication Specialist ............................................................................................................... $70-120 <br />Support Service/Technical Manager ............................................................................................... $80-155 <br />Support Personnel3 ........................................................................................................................... $35-95 <br />Rates for litigation support services will include a 30% surcharge.. <br />A ten percent (10%) markup will be added to subcontracts for professional support and construction <br />services to cover overhead and insurance surcharge expenses. <br />Invoices are payable within 30 days of the date of the invoice. Any amount not paid within 30 days shall <br />bear interest from the date 10 days after the date of the invoice at a rate equal to the lesser of 18 <br />percent per annum or the highest rate allowed by applicable law. <br />Reimbursable expenses including, but not limited to, the actual and reasonable costs of transportation, <br />meals, lodging, long-distance telephone charges, parking costs, postage, and shipping charges will be <br />billed at actual cost. Materials and supplies charges, printing charges, and equipment rental charges <br />will be billed in accordance with Barr's standard rate schedules. Mileage will be billed at the IRS- <br />allowable rate. <br />' Includes engineers, ecologists, biologists, chemists, hydrogeologists, geologists, industrial hygienists, soil <br />scientists, meteorologists, environmental scientists, information technology specialists, and landscape architects. <br />2 Includes surveyors, drafters, CADD operators, designers, cost estimators, construction observers, water, air and <br />waste samplers, safety technicians, interns, and data management technicians. <br />s Includes word processing, report production, project accounting, information specialist, and other project support <br />personnel. <br />4 Rates do not include sales tax on services that may be required in some states. <br />::ODMA\PCDOCS\DOCS\24&597\1 <br />