Laserfiche WebLink
Barr Engineering Company RECEIVED FED 2 :i_ 2008 <br />4700 West 77th Street Minneapolis, MN 55435-4803 <br />Phone: 952-832-2600 Fax: 952-832-2601 www.barr.com An EEO Employer <br />~ ~ ~, <br />~ , <br />February 18, 2008 <br />Minneapolis, MN Hibbing, MN Duluth, MN • Ann Arbor, MI Jefferson City, MO <br />Mr. Mark Maloney <br />Grass Lake Watershed Management Organization <br />4600 Victoria Street North <br />Shoreview M1~1 55126 <br />Re: Progress on Lake Owasso IJAA 23/62-946 <br />Barr Invoice Period: December 2J, 2007 through January 25, 2008 <br />Dear Mr. Maloney: <br />The enclosed invoice is for professional services, which include the following: <br />• Existing condition P8 model calibration runoff and pollutants <br />• Development of continuous. water balance modeling to verify P8 runoff modeling results/estimate <br />groundwater seepage ircluding the development of Lake W:abasso water balance to confirm Lake <br />Owasso water balance . <br />• Development of 20071n-lake water quality model (2-basin model) <br />• Begin estimation of critical management climatic conditions <br />• Development of 1995 - 2006 In-lake water quality model (1-basin model) including formatting WQ <br />data for models and developing P8 for time period <br />• Update P8 model for future conditions (land use and devices) <br />• Writing of UAA report including development of tables and figures <br />.~ ~.: <br />• -:Development of technical memo of preliminary finding <br />• Attendance at the January 24, 2008 GLWMO regular meeting <br />Over the past month we have continued efforts to calibrate the surface water and in-lake models to <br />the observed flow and water quality data collected by RWMWD and Ramsey ~;o~~nty. In additior. tc <br />model calibration we have been working on the draft UAA report and a technical memorandum <br />summarizing the project findings to date. Overall the project has fallen behind schedule due to the <br />unforeseen calibration difficulties, such as Lake Owasso's outlet structure not functioning as <br />designed, the Lake Wabasso outlet structure failing, and the atypical 2007 climatic conditions. The <br />unexpected calibration difficulties have resulted in a cost overrun of about $5,115 associated with <br />Tasks 004 and 005 (see table below). Also, as previously reported on the July 19, 2007 progress <br />invoice report, the development of the Lake User Survey (Task 010) required more effort than <br />originally anticipated which caused unforeseen c,osts.(e.g., unplanned meeting with stakeholders to <br />collect input on the lake a"sef survey; manager's request. to development of an on-line survey in <br />addition to the mailing; ~dditiorial postage relatedao the number of mailings; and associated project <br />management tasks). 'In July 2007 we believed that the added casts for the unscoped Lake User <br />Survey work could be.reeovered by other.comperzsating project efficiencies. However, the. , <br />unexpected calibration difficulties exceeded all other project budget savings (lake sediment core <br />