Laserfiche WebLink
Mr. Mark Maloney <br />Apri] 21, 2008 <br />Page 2 <br />The preliminary results of the diagnostic portion of the study were presented to the GLWMO Board <br />during their January 24, 2008 meeting. The Board discussed the potential need for additional field <br />monitoring to help reduce some of the uncertainty with the model calibration and to better access the <br />surface runoff from the yard waste composting site.. Therefore, the GLWMO Board requested that <br />Barr work with RWMWD to prepare a scope of work to perform additional monitoring during 2008, <br />to validate (or recalibrate if necessary), the models developed. for Lake Owasso in 2007, to reduce the <br />level of uncertainty quantifying the sources of pollutants to Lake Owasso, and to evaluate the impacts <br />of best management practices that can help improve the overall water quality of Lake Owasso. <br />The advantages of expanding the original scope include: <br />® The verification and refinement of the Lake Owasso watershed runoff and pollutant loading <br />model (P8), <br />• Abetter assessment and understanding of the external and internal loading sources to Lake <br />Owasso, <br />• The development of more accurate tools to evaluate the impact of Best Management Practices <br />(BMPs) on the overall water quality of Lake Owasso, and <br />• The ability to estimate the runoff water quality from the yard waste compost site and evaluate <br />its impact on the water quality in Lake Owasso. <br />The following table is a summary of the recommended additional work tasks, including the 2008 <br />monitoring tasks recommended for Lake Owasso and its watershed as well as the <br />validation/recalibration of the P8 pollutant loading model and the in-lake water quality model to 2008 <br />data. <br />Task Cost <br />Tasks 11 a-d -Continued 2008 Monitoring $16,220 <br />Task 12 - Validation/Recalibration of the Runoff and Pollutant <br />Loading Model using 2008 monitoring data $7,265 <br />Task 13 - Validation/Recalibration of the in-lake water quality <br />model using 2008 monitoring data $7,130 <br />Task 14 -Additional Year of Project Management $3,385 <br />Proposed Budget Adjustment for Additional Lake User Survey <br />Work and Unforeseen Calibration Difficulties (existing Tasks 4, 5, <br />10) $8,600 <br />TOTAL $42, 600 <br />Additional details about each task and why it is important to the study of Lake Owasso is discussed <br />further in the sections below. Attached are also an updated schedule for the completion of the study <br />(Attachment A) and the itemized cost estimates for the proposed tasks that fall outside the original <br />budget for the Lake Owasso UAA study (Attachment B). <br />P:\Mpls\23 MN\62\2362946\WorkFiles\ProjectManagement\ForGLWMO_04212008\Letter_Contract-Revised <br />SCOpe_Apr1121.doC April 21, 2008 Version <br />