Mr. Mark Maloney <br />April 21, 2008 <br />Page 2 <br />well as flow and water quality monitoring at the major discharges to the Central Park East wetland <br />can be performed in 2009. Since the watershed runoff model (P8) for the Lake Owasso watershed <br />will be calibrated to the 2008 monitoring data at Dale Street the Lake Owasso UAA can be completed <br />without the 2009 monitoring. Therefore, the 2009 monitoring efforts and results would need to be <br />presented in a separate report that could be completed in the first quarter of 20]0. <br />The following table is a summary of the proposed work for Option l and Option 2 of the Optional <br />Task (monitoring of the yard waste compost site) as well as the estimated costs. <br />Tasks Cost <br />Option 1 <br />Optional Task -Option l :Complete Runoff Monitoring at the $5,623 <br />Yard Waste Compost Area in the City of Roseville during the <br />Spring, Summer, and Fall 2008, Results included in the Lake <br />Owasso UAA <br />TOTAL( Option 1) $5,623 <br />Option 2 <br />Optional Task -Option 2: Monitor h'lows and Water (Zuality at ~3y,3~3 <br />Dale Street during the Spring, Summer, and Fall 2008. If areal <br />loading of P is significantly higher than the rest of the watershed, <br />complete runoff monitoring at the yard waste compost site as well <br />as inflows to the Central Park East wetland in 2009. Prepare and <br />present monitoring results report. <br />TOTAL(includirzg Optional Task -Option 2) $39,373 <br />Additional details about each task and why it is important to the study of Lake Owasso is discussed <br />further in the sections below. Attached is an updated schedule for the completion of the study <br />assuming the Optional Task -Option 1 (Attachment A) as well as the itemized cost estimates for the <br />proposed tasks associated with Option I (Attachment B). Attachments C and D provide the <br />updated schedule and itemized costs, assuming Optional Task -Option 2 is selected and the <br />monitoring results are included in the Lake Owasso UAA. Also attached is a figure showing the <br />location of the proposed 2008 monitoring sites as well as the optional monitoring sites as proposed as <br />part of Option 1 and Option 2 (Attachment E). Attachment F shows photos of the yard waste <br />compost site and a schematic of the proposed runoff monitoring set-up at the compost site is included <br />as Attachment G. <br />Tonal Tasks: st ite taf oitrin <br />Option l: <br />Expected Cost: $5,623 (by Barr) <br />Currently, there are no data available to estimate the water quality of the runoff from the yard <br />waste compost area or its impact on the overall water quality in Lake Owasso. Water quality <br />monitoring is recommended during the spring and summer at the outlet of the Central Park East <br />Wetland at Dale Street to better understand the water quality and flows from this system during <br />storm events. Although this recommended monitoring site is located near the composting site, it <br />will be difficult to estimate the contribution of the compost area to the phosphorus and solids <br />P:AMpls\23 MN\62\2362946\WorkFiles\ProjectManagement\ForGLWMO_04212008\Compost_Monitoring_Revised Letter <br />Con[t'act_April2l.doc April ? (. 2008 Version <br />