Laserfiche WebLink
Phase/Work Task and Description Total Material <br />Cost Total Cost <br />O tion 1 ~ <br />Yard Waste Com ost Site Runoff Monitorin in 2008 <br /> Monitorin of runoff at 3 locations at the com ost site in Roseville <br /> Materials for 3 stations ' <br /> 1/2-inch PVC Tubin 10 feeUstation $18 <br /> 1/2-inch PVC Ca s 2 ca s/station $9 <br /> ~-inch Schedule 40 PVC 1 foot/station $20 <br /> 1-inch thick 4-1/3-inch diameter ra PVC Ca 1 ca /station $18 <br /> 1- uart lass bottle $28 <br /> Silicon tubin 2 feet/site $10 <br /> N Ion Screenin $61 <br /> Total Material Cost $163 $163 <br /> <br /> Construction and Installation 3 stations $1 2.10 <br /> <br /> Staff Time for sam le collection ands stem flushin for f 0 storm events in 2008 $2 000 <br /> <br /> Laborator Costs TP TDP TSS & VSS z <br /> Total Phos hours $660 <br /> Total Dissolved Phos horus $810 <br /> Total Sus ended Solids 390 <br /> Volatile Sus ended Solids $390 <br /> Total Laborartor Costs 2 250 2.250 <br /> Subtotal $5 623 <br /> <br /> I <br />1 - www.us lastic.com <br />2 -Braun Intertec 2008 Pricin <br />