Laserfiche WebLink
Estimated Costs for Runoff onitoring at the Yard VI/aste Compost Area in <br />Roseville & the InfloWS to Central Park East 1lVetland -Option 2 <br /> <br />PhasefWork Task and Description Total Cost <br />O Lion 2 <br />Yard Waste Com ost Site Runoff'Monitorin in'2009 <br /> Nlonitorin of runoff at 3 locations at the com ost site in Roseville <br /> Materials for 3 stations ' <br /> 112-inch PVC Tubin 10 feet/station <br /> 1/2-inch PVC Ca s 2 ca s/station <br /> 4-inch Schedule 40 PVC 1 footJstation <br /> 1-inch thick 4-1l3-inch diameter ra PVC Ca t ca Istation <br /> 1- uart lass bottle <br /> Silicon Lubin 2 feet/site <br /> N Ion Screenin <br /> Total Material Cost $163 <br /> <br /> Construction and Installation 3 stations $1 210 <br /> <br /> Staff Time for sam le collection ands stem flushin for 10 storm events in 2009 $2 000 <br /> <br /> Laborator Costs TP TDP. TSS, & VSS z <br /> Total Phos hours <br /> Total Dissolved Phos horus <br /> Total Sus ended Solids <br /> Volatile Sus ended Solids <br /> Tota(Laborartor Costs $2 250 <br /> Subtotal 55.623 <br />.;: r'. t,h~3'r~c--~'d..tFlGli i ..,.< ,.~ ,. .t _ ti ... t ..~.. .. _. .. .._, <br />'=u~ !va 3I'"~d , 7fit_';i` ca `'>t~atic r n _'i1"9'. <br />`- . aff Time $10 200 <br />~ _ ~borator Costs $1 620 <br />Subtotal $11 820 <br />Generate the Com ostSite Stud 1Re ort <br /> Review Monitorin Data & Generate Review Draft Re ort and Fi ures $10,730 <br /> Generate Final Draft Re ort and Fi ures $3,320 <br /> Conduct Meetin with WMO about Draft Re ort $2,260 <br /> Conduct Meetin with WMO about Final Re ort $2,010 <br /> Subtotal $18`320 <br /> <br />Project EJianagement ~ 11~isc. Corres ondence <br /> Project Mana ement $3.610 <br /> Subtotal $3 610 <br /> <br /> <br />1 - www.usplastio,com <br />___ <br />__ <br />2 -Braun Intertec 2008 Pricin <br />