Laserfiche WebLink
Shoreview Comprehensive Plan <br />The SWPPP addresses six minimum control measures required as part of the NPDES permit <br />process. To address each of the minimum control measures the SWPPP provides a description of <br />each Best Management Practice (BMP), an implementation, measurable goals that determine the <br />success or benefit, and the person responsible for its completion. The minimum control <br />measures are listed below: <br />1. Public Education and Outreach <br />2. Public Involvement and Participation <br />3. Illicit Discharge Detection and Elimination <br />4. Construction Site Storm Water Controls <br />5. Post Construction Storm Water Management for New Development and Redevelopment <br />6. Pollution Prevention/Good Housekeeping for Municipal Operations <br />Surface Water Utility Fee <br />The City has adopted a surface water utility fee to fund repair and replacement of existing <br />conveyance systems and provide a funding source for implementation of goals listed in the <br />SWMP and BMPs listed in the SWPPP. Estimated operating costs, capital costs, and debt <br />payments for insuring the integrity of the system are included in the City's Comprehensive <br />Infrastructure Replacement Plan and Policy, with a time horizon of 50 years. The City's Capital <br />Improvement Plan (CIP), which has a 5-year time horizon, includes a more detailed description <br />of projects. A copy of the portion of the current CIP showing projects addressing surface waters <br />is attached (Table 9D-1). <br />Table 9I)-1 <br />Surface Water Improvements: <br />Commons park storm pond dredging <br />Arbogast/Lake Emily pretreatment chamber <br />Turtle Lane pre-treatment facility <br />Storm pond dredging <br />Lake Wabasso pre-treatment facility <br />Update storm lift station controls <br />TOTAL <br />Year <br />2008 Yeaz Yeaz Year <br />2009 20]0 2011 <br />100,000 - _ _ <br />70,000 - _ _ <br />- 80,000 - - <br />- 100,000 - 105,000 <br />- - 120,000 - <br />Yeaz <br />2012 <br />30,000 <br />$ 170,000 $ .180,000 $ 120,000 $ 105,000 $ 30.000 <br />$2ogooo - <br />$laa,ooa -- <br />$160,000 ~~-'Y <br />$140,000 -, <br />$120,000 ~, ---- <br />$100,000 - - - <br />$eo,ooa - <br />$60000 I' - -- - -' <br />$40,000 - <br />it <br />$20,000 -. _- <br />2008 2009 ZO30 2011 2012 <br />SurFace Water Management Page 9.D-5 <br />