Laserfiche WebLink
Attachment A. Descri tion of Additional and Unantici ated Sco Items <br /> A ri120041nvtrice Unbiiled Work (After A ril 2009 <br />Requested <br /> Unbiiled 6Vork Unbiiled Work Unbiiled Work Budget <br />Task/Description Additional WorkNnanticipated Ttems Contract Total Work Tata1Bi11ed Balance (Through Aprt ]a, (April 11 through (Projected for <br />Amendment <br /> Budget Performed 2009 Ma 15 2009 Future Tasks <br />` ~ l Determine Current and Historical Water $2,p2p $2,544 $2,544 ($524) $0 $0 $0 $0 <br /> ualil Caodiiians (includin 2008 work <br /> SetBeneftcialUseGoals $1,150 $1,152 $563 $588 $589 $0 $0 $589 <br /> 'Tools 3 Assess attainment or nonatlainmeol for $350 $366 $366 ($16} $0 $0 $0 $0 <br /> current watershed laud use conditions <br /> Task 4 EsGmale annual storm water runoff and $18,345 $18,345 $18,345 $0 $0 $0 $0 $0 <br /> has hares bud et to the lake <br /> Reconcile the hydrologic and phosphorus <br />$0 <br />$0 <br />$0 <br />$0 <br /> Task S budgets to observed indake conditions using a -- $21,743 $21,956 $21,956 ($213) <br /> lake water uaGt model <br /> <br />Task 6 Using the lake model, assess likelihood of <br />benefirial use attainment under ultimate <br />$3,050 <br />$3,054 <br />$94 <br />$2,957 <br />$2,960 <br />$0 <br />$0 <br />$2,960 <br /> watershed load use conditions <br />Task1 Recommend Feasible Alterne6ve Remedial $5,040 $5,097 $5,097 ($57) $0 $0 $0 $0 <br /> Measures <br /> <br /> -Development and production of the January 2008 Technical Memo, January 2009 Draft Report, April 2009 Report, and <br /> potentially a Future Report if there are changes requested as the result of the GLWMO review (Original scope only accounted <br />T <br />k 8 Generate the Lake Owasso For develo men( and roduction of draft and final re ort 870 <br />$i 6 I90 <br />$27 $I SA58 812 <br />$1 $12,132 $4,301 $920 $17,352 <br />as Diagoostic/Feasibiliiy Study Report , , , <br /> • Additional items to be discussed in the UAA report as the result of the calibration issues and Additional modeling required <br /> - Pre aration of additional resentations and u date materials for unbud eted meetin s <br /> - Un fanned meetin in the field with lake residents and RWMWD to look at direct dischar es to the lake <br /> - Attendance of 9 GLWMO managers meeting per the manager s request for status updates (only 2 meetings with the managers <br />T <br />k 9 Project Management & Misc. Correspondence were outlined in the on 'nal ro'ect sco $8 <br />545 791 <br />$10 855 <br />$9 ($1,310) $936 $2,161 $1,760 $4,857 <br />as (ineludiag 2008) - Futtue Attendance of Ma 28, 2009 mans ers' worksho er the r nest of the GLWMO mono ers , , , <br /> - Attendance of 3 Lake Association meetings (including future attendance of the mid-Juno 2009 meeting) (only 2 meetings <br /> with the Lake Association were outlined in the on inn] ro'ect sco e <br /> 001 $0 $0 $0 $0 $0 <br />ask 10 CoaductLakeUserSurv -- $130(11 $13,001 $13, <br /> -Additional work with RWMWD on establishment of the monitoring site locations and setting water quality sampling triggers <br /> 2~I8 Monitoring at sites im acted b tailwater effects from Lake Owasso Court Road C and Dale Street $2,OD0 $2,833 $2,833 {$833) $0 $0 $D $0 <br /> - Additional work to address sam les collected with a " as" smell at West Owasso Blvd. <br /> - ]sues with the mnoffvolume calibration -Extremely dry calibration years (2007 & 2008) with law water levels in all ponds <br /> throughout the watershed (many ponds not discharging at various times throughout the summer). Infiltration (excessive <br /> evaporation) terms needed to be added to ponds throughout the watershed to help calibrate the runoff volumes predicted by the <br /> P8 model. <br /> -Issues related to the runoff flow monitoring data at the Wesl Owasso Blvd site including baseflaw through this system and <br /> issues with the flow monitoring data in mid-2007. It seems the 2007 flow monitoring issues could be the result of the shifting <br /> of the monitorin ui men( duri the tar a storm events that occurred in mid-Au ust 2007. <br /> - Issues related to the runoff flaw monitoring data at the County Road C (2007 & 2008) and Dale St (2008} sites including <br /> flows impacted by tailwater effects from Lake Owasso, the need to develop specific rating curves at each site to account for <br /> tailwater effects for use in the PS model <br /> Validation/RecalibraGon o[ the Runoff and -Issues with the development of the Lake Owasso water balance including a variable discharge rating curve as the result of ice <br />Task 12 Pollutant Loading Model using 2008 build up and the timing of ice-on and ice-off and variable groundwater exchange, both seasonally as well as annually $7,265 $18,051 $9,726 ($2,461) $8.325 $0 $D $8,325 <br /> ito <br />i <br />data <br /> mon <br />r <br />ng -Limited runoff water quality data at County Road C in both 2007 & 2008 as the result of tailwater effecEs from Lake <br /> Owasso (issues with water quality sampling triggers, limited number of samples collected far composite) and low water levels <br /> and therefore no dischar a Burin the summer. <br /> • Internal loading in the County Road C wetland determined based on grab samples collected between storm events in 2008 <br /> - FLUX modeling performed to better understand actual water and phosphorus loads at each monitoring station (Galtier St., <br /> West Owasso Blvd, County Road C, and Dale StJ and to help quantify the internal loading occurring in the water bodies <br /> within the watershed. <br /> - Development of a phosphorus mass balance model to develop the estimate infernal loads from watershed wafer bodies that <br /> n eeded to be routed to Lake Owasso inthe in-lake water quality model. This mass balance mode] needed to be applied to all <br /> c limatic conditions as well as al] BMP scenarios that evaluated chart es in the watershed loads. <br /> • Unforeseen modifications to the in-lake water quality model ware required to reflect the conditions at Lake Owasso <br />1 YalidationlRecalibration ofthe in•Lake Water includin toe loco ration of the watershed internal loadin $7 <br />130 $14 <br />1 l5 073 <br />$1 $57 $7,042 $0 $0 $7,042 <br />Task <br />3 Quality Model using 2008 Data . The phosphorus mass balance model needed to be applied to all climatic conditions as well as all BMP scenarios that , , , <br /> e valuated chart es in the watershed loads to be used as in uts to the in-lake water unlit model. <br />TOTAL $]06510 $138,494.. _ __ $106 10 $0 $31,984 $6,462 $2 680 $41125 <br />Projected costs for any updates and reproduction of the final draft of the UAA report if commems or changes are requested. <br />Projected costs for the preparation and attendance of the CLWA70 workshop meeting on May 28, 2009 and the lake Association meeting in mid-Jana 2009 <br />