My WebLink
|
Help
|
About
|
Sign Out
Home
2010-05-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-05-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2010 9:37:14 AM
Creation date
5/24/2010 9:24:42 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/25/2010
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />List of Tables <br />Table l: Pilot Study Components .................................................................................5 <br />Table 2: City of Roseville: Composition Analysis Categories ...................................... 8 <br />Table 3: Comparison of Pounds per HH Collected per Route with and <br />without Contaminants, Before and During the Pilot ......................................... l l <br />Table 4: Comparison of Gross Pounds per HH Collected per Route Before <br />and During the Pilot ..........................................................................................12 <br />Table 5: Comparison of Net Pounds per HH Collected per Route Before and <br />During the Pilot .................................................................................................13 <br />Table 6: Comparison of Projected Pounds Per HH Per Year .......................................15 <br />Table 7: Comparison of Set-out Rates Before and During the Pilot (Bi- <br />weekly Routes) ..................................................................................................16 <br />Table 8: Set-out Rates Before and During the Pilot (Weekly Routes) ........................17 <br />Table 9: Comparison of Rates Before and During the Pilot (Bi-Weekly <br />Routes) ..............................................................................................................18 <br />Table 10: Participation Rates Before and During the Pilot (Weekly Routes) ..............18 <br />Table 11: Roseville Resident Survey Summary ..........................................................19 <br />B~~os iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.