My WebLink
|
Help
|
About
|
Sign Out
Home
2010-05-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-05-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2010 9:37:14 AM
Creation date
5/24/2010 9:24:42 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/25/2010
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ttac e - <br />cer is fro a City orevie ecclin <br />Contract - esi als eire es <br />AGREEMENT FOR RECYCLING COLLECTION <br />This Agreement is made on the 1St day of January 2001, between the CITY OF <br />SHOREVIEW, 4600 North Victoria Street, Shoreview, Minnesota 55126 ("City") and <br />WASTE MANAGEMENT INC., a Minnesota corporation, with its current local place <br />of business at 775 Rice Street, St. Paul, Minnesota 55117 ("Contractor"). <br />4. DISPOSAL OF RECYCLABLES AND PROCESS RESIDUALS -Contractor <br />shall use its best efforts to assure that all recyclables collected in the City are <br />not placed in landfills or incinerated and are distributed to the appropriate <br />markets for reuse. The Contractor shall dispose of no more than five (5) <br />percent of material as process residuals as waste residual as part of normal <br />recyclable materials processing operations. This process reject (residuals) <br />amount shall be a maximum by weight as measured from total outgoing <br />products shipped for the month, and shall be reported for any of the <br />Contractor's recyclables processing facilities receiving material from the City. <br />The Contractor shall report actual percent process residuals disposed, and the <br />disposal facility or facilities utilized for disposal, with each monthly billing <br />statement.. If the process residuals maximum is exceeded for any facility for <br />any month, the report shall include the types and amounts of materials <br />landfilled or incinerated, the reason for the landfilling or incineration, and the <br />steps being taken by Contractor to avoid landfill or incineration. <br />5. LACK OF ADEQUATE MARKET DEMAND - In the event that the market <br />for a particular recyclable ceases to exist, or becomes economically depressed <br />that it becomes economically unfeasible to continue collection processing and <br />marketing of that particular recyclable, the City and the Contractor will both <br />agree in writing that it is no longer appropriate to collect such item before <br />collection ceases. Contractor shall pay the costs of all disposal of any item <br />collected that is deemed not recyclable by Contractor and the City due to Lack <br />of adequate market demand. The City and Contractor shall specify a date in <br />the said written agreement to cease collection of the recyclable item in <br />questions. Contractor shall at all times be under a duty to minimize <br />recyclables ending up in landfill or incineration. If such disposal becomes <br />necessary, Contractor shall dispose of the materials at a facility specified in <br />writing by the City or an alternative agreed upon by the City and the <br />Contractor. <br />B~~os <br />
The URL can be used to link to this page
Your browser does not support the video tag.