Laserfiche WebLink
City of Roseville 2010 Fee Schedule <br />Sewer Connection Permit Fee — Engineerin� <br />Sign Permit Fee: <br />Utilize building permit fee schedule. No plan review fee <br />Minimum fee <br />Swimming Pool Permit Fee — Planning & Zonin� <br />$ 44.00 I $ 55.00 <br />Swimming Pool Permit Fee — Engineerin� <br />Water Connection Permit Fee — Planning & Zonin� <br />�• � � ' � ' ��� •� ' � <br />Residential $ 83.00 $ 83.00 <br />Plan review and <br />Commercial 270.00 permit fee based <br />on valuation <br />Re air 44.00 55.00 <br />Disconnect - residential 62.00 75.00 <br />Disconnect - commercial $ 138.00 $ 150.00 <br />11 <br />