My WebLink
|
Help
|
About
|
Sign Out
Home
res_5385
Roseville
>
City Council
>
City Council Resolutions
>
05xxx
>
5300
>
res_5385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:07:38 AM
Creation date
4/23/2005 4:55:50 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
5385
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />pursuant to published notice on the proposed construction of Water <br />and Sanitary Sewer Improvements W-SS-69-25 and Street Improvement <br />P-69-26 consisting of construction on Aladdin Street between Rose <br />Place and 700 feet south of Rose Place to the cul-de-sac dead end. <br />Watermain construction consists of a 611 diameter watermain and all <br />necessary appurtenances including services, valves and hydrants to <br />serve the abutting property on either side of the street right of <br />way. Sanitary sewer construction consists of the furnishing and <br />installation of service connections to the existing sanitary sewer <br />line on Aladdin Street, to serve the abutting property on the west <br />side of the street right of way. Street construction consists of <br />the grading of Aladdin Street, together with the construction of <br />concrete curb and gutter al ong both sides of the roadway through- <br />out its entire length followed by the installation of sub-base <br />and a 2 inch plant-mixed bituminous surfacing. The width between <br />curbs face to face would be 32 feet. Also included as part of <br />the street construction is the construction of approxin,ately 150 <br />feet of storm sewers and necessary manholes and catch basins, which <br />are necessary to prOVide proper drainage for the street. The <br />foregoing, as described in the notice of hearing at a cost presently <br />estimated to be approximately $23,174, is substantially in <br />accordance with the preliminary engineer's report as to the <br />feasibility thereof which is now on file in the office of the <br />Village Manager. The Council, having considered the views of all <br />interested persons at the public hearing, and being fully advised <br />in the premises, does hereby determine and order that said improve- <br />ment shall be constructed and financed, and special assessments <br />shall be levied therefor, pursuant to said Chapter 429, and that <br />the area proposed to be assessed therefor shall include the property <br />as described in the notice of hearing. <br /> <br />2. Final plans and specifications, having previously been <br />received from the Village Public Works Director, are hereby <br />approved. <br /> <br />3. The Village Manager shall prepare and cause to be inserted <br />in the Roseville Sun, the official paper, and in the Construction <br />Bulletin, an advertisement for bids upon the making of such <br />approved plans and specifications. The advertisement for Water <br />and Sanitary Sewer Improvements W-SS-69-25 and Street Improvement <br />P-69-26 shall be published as required by law, Shall specify the <br />work to be done, shall call for bids upon the basis of a cash <br />
The URL can be used to link to this page
Your browser does not support the video tag.