Laserfiche WebLink
City of Roseville <br />Capital Improvement Plan <br />2011-2020 <br />CIP -Sanitary Sewer <br />Description <br />Sewer main repairs <br />I & I reduction <br />Liff station repairs/upgrades <br />Replace/Upgrade 3CADA system <br />Electronic message board (4-way) <br />Shop sweeper (6-way split) <br />Replace 1990 air compressor(1/3) <br />Mainline televising system <br />GP3 witlr computer (1/3 share) <br />Zero-Nm mower (1/4 cost) <br />#201 Replace JetterNac[or <br />#202 1-ton with damp box/plow <br />#203 1-ton service truck <br />#213 Extend-a-jet replacement <br />#220 Towmaster trailer - 10 ton <br />#360 Backhoe Sand Bucket (3-way split) <br />#225 Backhoe (4-way split) <br />#601 3kids[eer (1/4) <br />Self-propelled paver (4-way split) <br />#169 Zero Nm mower(1/4) <br />#237 W acker compactor (1/4) <br />Tvpe 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Total <br />I $ 400,000 $ 600,000 $ 700,000 $ 900,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 8,600,000 <br />I 150,000 150,000 150,000 - - - - - - - 450,000 <br />B 100,000 100,000 25,000 25,000 32,000 38,000 100,000 25,000 25,000 15,000 485,000 <br />E - - - - - - - 50,000 - 50,000 <br />E - - - - - - - - 7,800 - 7,800 <br />E - - - - - - - - - - - <br />E 8,000 - - - - - - - - - 8,000 <br />E - - - - - - - - - 40,000 40,000 <br />E - - - - - - - - - 4,000 4,000 <br />E - - - - - - 4,000 - - - 4,000 <br />V - - - - 300,000 - - - - - 300,000 <br />V - - - - - - - - - 40,000 40,000 <br />V - - - 28,000 - - - - - - 28,000 <br />V - - - - - 35,000 - - - - 35,000 <br />V - - - - - - - - - 10,000 10,000 <br />V 2,000 - - - - - - - - - 2,000 <br />V - 40,000 - - - - - - - 40,000 <br />V - - - - - - - - 8,000 - 8,000 <br />V - 30,000 - - - - - - - - 30,000 <br />V - - - - - - - 5,000 - - 5,000 <br />V - - - - - - - - 8,000 - 8,000 <br />E <br />Total $ 660,000 $ 880,000 $ 915,000 $ 953,000 $ 1,332,000 $ 1,073,000 $ 1,104,000 $ 1,080,000 $ 1,048,800 $ 1,109,000 $ 10,154,800 <br />