Laserfiche WebLink
Roseville Estates MHP <br />Utilities: <br />Sewer is 8" clay pipe. <br />Water is 2" cast iron main. <br />Electric: Bring up to code on the six new homes, 100 Amp <br />Creating new Greenspace. <br />Remove 9600 sq. ft. of existing asphalt. adding5780 sq. ft. of homes and <br />parking pads thus leaving 3820 sq. ft. of new Greenspace. <br />