My WebLink
|
Help
|
About
|
Sign Out
Home
2001_1022_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2001
>
2001_1022_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:24:08 PM
Creation date
10/25/2010 1:38:55 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 The Planning Commission determined that the Concept PUD Amendment for land uses <br />and master site plan proposed by Solutia, consisting of a 15,500 square feet of additional <br />office space and 6,000 square feet of allowable office space within the e�sting Planned <br />Unit Development, is consistent with the comprehensive plan and the intent of the 1997 <br />Centre Pointe PUD, noting that the city policy is market driven development and office <br />space is now needed in the market, and the proposal meets/exceeds the City's goals for <br />head of household living wages. <br />7.3 Based on the above determination, the Roseville Planning Commission recommended (5- <br />0) approval of the proposed General Concept Plan for a PUD amendment (#1177) to <br />allow construction of the 21,500 square foot Solutia office building, an increase in the <br />allowable square footage within the Centre Pointe PUD of 15,240 square feet subject to <br />the conditions listed in that project report dated 10/1 0/O1. <br />7.4 Further, the Planning Commission made no comment on the Draft EAW nor cited any <br />significant environmental impacts requiring further review in an Environmental Impact <br />Statement. <br />8.0 SUGGESTED CITY COUNCII, ACTION: <br />It is suggested that the Roseville City Council take the following action: <br />■ By motion approve (approve w/modifications or deny) the change in the <br />Master Site Plan for Lot 3, Block 1, Centre Pointe Business Park from <br />restaurant to office and the General Concept Plan for Solutia Consulting <br />regarding the proposed construction of a 2 1,240 square foot, two-story office <br />structure, which increases the allowable building size by 15,240 square feet from <br />6,000 square feet to total of 21,240 square feet, subject to the conditions listed in <br />Section 41 (A through F) of the project report dated 10/22/0 1 and eliminating all <br />references to a restaurant use, associated terms and conditions, and stipulating <br />terms and conditions under which the Solutia Consulting office structure must be <br />developed consistent with the proposed site plan, structure design plan and other <br />supporting plan set documents. <br />■ By motion approve (approve w/modifications or deny) �rst reading of an <br />ordinance amending Planned Unit Development Agreement #1177. <br />� By motion approve the distribution of the Voluntary Draft EAW for review, <br />with notice to be published concerning its availability. <br />PF 3338 -RCA (10/22/O1) -Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.