Laserfiche WebLink
�b�SI� <br />October 1, 2001 <br />Bob Bietsheid <br />Park and Recreation Director <br />City of Roseville <br />Fairview Community Center <br />1910 W. County Road B <br />Roseville, Minnesota 55113 <br />Re: Rosebroolc Soccer Fields and B-Dale Softball Field - Lighting. <br />Dear Bob, <br />Craig Gallop <br />Musco Sports lighting, Inc. <br />Phone:763/533-2030 <br />Fax:7631525-0070 <br />E-maii: craig.gallopr�musco.com <br />PO Boz 27231 <br />Golden Valley, MN 55427 <br />Web site: www.musco.com <br />It was nice seeing you again and meeting with Jeff. I am certain that the product, technology, and <br />service provided by Musco Sports-Liiting will be of value to the City of Roseville. I recommend <br />lighting the facilities with the Musco Light-Structure system. The Light-Structure consists of a pre- <br />stressed concrete base, galvanized steel pole, remote electrical components located at a 10' height <br />on the pole, pole wire ham�ss, and pole top lucninaire assembly with 1500 watt metal halide <br />lighting. The lighting system includes Level-8 spill and glare control adaptations which will <br />eliminate 80% of unwanted spill light and glare ligh� It also includes a 10 year warranty covering <br />lamps, equipment, and labor. In addition, in the l Oth year of operation, Musco will completely <br />relamp the facility. <br />� <br />x fields d be lit to 30 foqtcandles hich will <br />of 6 7�' oles } The cbst of t�e 1'�htin�/s�stee�: t <br />� lhis � allo�v the �hting td.be ao�itrolled y� on <br />of the C trol Lmk systesn is estim t�at $7,645. <br />The softball field at B-Dale would be lit to 30 footcandles infield aad 20 footcandles outfield. <br />There would be a total of 4 60' poles and 2 70' poles. The cost of the lighting system installed is <br />$59,162. I estimate the additional cost for the underground electrical system to be $11,000. '�e <br />K.W requirements for the softball field is 44.8 KW. <br />Costs assume that the soils are standard 2000 psi strength with free-boring techniques used. The <br />estimated electrical costs are based on a transformer being located adjacent to the fields. Please <br />feel free W call me if th�ere are anp questioas or if more deta�ed 'mformatioa is needed. <br />� , • /�� , <br />•�� � <br />• i:t•� <br />cc: Jeff Evanson <br />��"�:.'�� <br />• <br />C��� <br />