My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0211_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0211_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 3:09:40 PM
Creation date
10/25/2010 1:45:52 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 11 Development - Hamline Center <br />5-10year plan <br />Phase II development along the easternmost portion of the study area includes the entire <br />Hamline Shopping Center and the e�sting office building currently owned by <br />Presbyterian Homes. There are several important objectives in the redevelopment of this <br />site including the following: <br />♦ Provide an entryway or gateway to the Arona-Hamline Neighborhood area. <br />♦ Retain some of the successful neighborhood retail services. <br />♦ Be financially feasible for the owner and/or developer of the site to redevelop. <br />� Add green space to provide more appealing site, public gathering places, and <br />water retention areas that are currently not addressed on the site. <br />� Mix retail, office, rental housing, owner occupied housing, sma11 business and <br />civic and educational uses in a pedestrian-friendly design. <br />♦ Encourage transit-oriented design. <br />Phase II provides a higher-density design on Hamline Avenue, which is adjacent to <br />existing high density uses to the east and south. Lower density land uses such as <br />townhomes are appropriate on the north side to provide a smooth transition to the e�sting <br />single-family neighborhood and duplexes. <br />The Hamline Center site is ideal for intergenerational civic and/or educational uses such <br />as senior meeting space, daycare and charter schooL This is due to its easy access and <br />visibility from Hamline Avenue and the past requests to convert some of the existing <br />Hamline Center retail space to accommodate these uses. Such uses could be in leased <br />space created by the private sector developers. <br />The suggested proposal for Phase II extends the "grid" street pattern, keeping in mind the <br />long-term development of the area with easy connections from Hamline to the Arona site. <br />The main boulevard bisecting the site is proposed as a heavily landscaped and decorative <br />green space that is inviting to the public with an attractive open space as its entry feature. <br />The main boulevard could also meander from Hamline to the Arona site and include <br />pathways that connect to the wetland and trail systems. <br />The higher-density uses are proposed as senior independent or assisted living adjacent to <br />the existing high-density apartments with underground parking. The neighborhood retail <br />would include second- and possibly third-story apartment or office units with <br />underground and street parking. The concept provides options for live/work units that <br />would appeal to home-based occupations with the need to serve clients. This type of use <br />would again attract young professionals and empty nesters. <br />The lower-density uses include multi-level townhomes with rear garages or underground <br />parking to increase the street appeal and encourage interaction of people on the streets <br />and in the public spaces. <br />5 — Draft (7/12/Ol, amended 2/04/02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.