Laserfiche WebLink
Proiect Number # 02-2 <br />PROPOSED PROJECT TO THE <br />ROSEVILLE CENTRAL PARK FOUNDATION <br />DATE SUBMITTED TO FOUNDATION: January 3, 2002 <br />REQUESTING ORGANIZATION: Roseville Parks and Recreation <br />ADDRESS OF ORGANIZATION: 1910 County Road B, Roseville, MN 55113 <br />PROJECT CHAIR: Jeff Evenson. Park Proiect Coordinator <br />ADDRESS: Same <br />HOME PHONE: NA WORK PHONE: 651-415-2115 <br />GENERAL DESCRIPTION OF PROJECT AND AREA <br />A. Area of Park: Central Park- Lexington <br />Project Description: Re-development of Lexington Avenue Flower Beds: <br />. Updated irrigation system designed specifically for these flower beds <br />. Concrete edging <br />• Small retaining wall in some areas <br />. Wild Roses at signs on ends, entrance sign and beds on each side of entrance drive <br />. Improved soils <br />C. Proiected Cost: $60.000 <br />D. Sources of Funds: Central Park Foundation <br />E. Anticipated Completion Date: May 20, 2002 <br />F. Project Notes: This is the most visible, notable area of the park that is seen annually by tens of <br />thousands of drive by visitors. This project will add more year around aesthetics, <br />aid in improved maintenance and a better overall quality appearance. <br />G. Central Park Foundation Comments: <br />II Board Action: Date: 01-03-02 II <br />IAuthorized Signature: II <br />