Laserfiche WebLink
A p r 0 1 0 2 09: 22�] City of Maplewood <br />PAVEMENT MANAGEMENT POLICY <br />G. <br />T <br />1 <br />• ��- ' • -• <br />Complete reconstruction <br />Partial reconstruction <br />Reclamation and overlay <br />Bituminous surface replacement <br />Mill and overlay <br />651 748 3089 <br />CITY OF MAPLEWOOD <br />.�- -� � 'll'1 i: <br />20 years <br />20 years <br />20 years <br />15 years <br />15 years <br />If an additional improvement is needed for a street that has been assessed <br />under the Pavement Management Policy, a credit shall be prorated by the <br />percentage of years the improvement has lasted compared to the expected life <br />estimate above. The credit is based on the current assessment rate for the <br />original improvement. The credit will be applied to the assessment proposed for <br />the new project, <br />Example: A mill and overlay street in 1999 needs to be partially reconstructed <br />in 2009 (or 10 years). A credit of 5/15, or 33.3%, of the year 2009 <br />mill and overlay assessment rate would be applied toward tne <br />assessment proposed for the new project. <br />CORNER LOTS <br />Residential corner lots would be assessed on only one side based on frontage or <br />driveway access. Commercial/industrial, including higher-density residential, <br />may be assessed for multiple projects based on access. <br />COMMERCIAL/INDUSTRIAL, INCLUDING HIGHER-DENSITY RESIDENTIAL <br />Commercial/industrial, including higher-density residential, properties will be <br />assessed based on parcel size, land use and proposed improvement. Each <br />project will be considered individually, but in general the following will apply. <br />Predominantly residential streets: Commercial/industrial, including <br />higher-density residential, property will be assessed multiple equivalent <br />units based on parcel size and land use. <br />Page 4 <br />p.6 <br />