Laserfiche WebLink
resulting from plat approval and development. The Developer shall indemnify the <br />City and its officers and employees for all costs, damages or expenses which the City <br />may pay or incur in consequence of such claims, including attorney's fees. <br />C. The Developer shall pay, or cause to be paid when due, and in any event before any <br />penalty is attached, all charges referred to in this Contract. This is a personal <br />obligation of the Developer and shall continue in full force and effect even if the <br />Developer sells one or more lots, the entire plat, or any part of it. <br />D. The Developer shall pay in full all bills submitted to it by the City for obligations <br />incurred under this Contract within thiriy (30) days after receipt. If the bills are not <br />paid on time, the City may halt pl8i development work and construction including, <br />but not limited to, the issuance of building permits for lots which the Developer may <br />or may not have sold, until the bills are paid in full. Bills not paid within thiriy (30) <br />days shall accrue interest at the rate of nine percent (9%) per year. <br />E. In addition to the charges referred to herein, other charges may be imposed such as, <br />but not limited to, sewer availability charges ("SAC"), City water connection charges, <br />City sewer connection charges, City storm water connection charges and building <br />permit fees. <br />18. Building Permits. Unless prohibited in writing by the City Engineer, no building permits shall <br />be issues until: <br />A. In order to provide emergency vehicle access, a passable Class 5 road base must be <br />e�tended to within 150 feet of any address seeking a building permit. To the e�tent <br />that it helps footings and foundations and basements are not considered structures and <br />therefore, it would be possible to do this work anywhere on the site beyond the 150 <br />foot radius from a Class 5 drive. The City could issue building permits for these <br />structures with a limitation that the construction not e�tend beyond the basement until <br />emergency vehicle access can be provided. <br />B. It is important to have temporary address numbers on the building site during <br />construction. <br />C. While building permits can be issued on a Class 5 road base, certificates of <br />occupancy cannot be issued until curb and gutter and bituminous surfacing (at least <br />the first lift) are installed. Other occupancy standards include the installation of a <br />hard surface driveway, and the installation of the appropriate ground cover. <br />D. In order to protect against erosion and to maintain the cleanliness of the site, erosion <br />control will be required around individual lots together with a rock access drive to the <br />building site. Please note requirement for cement trucks to be cleaned before leaving <br />the proj ect. <br />Page 5 of 8 <br />