My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0617_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0617_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 1:57:08 PM
Creation date
10/25/2010 1:47:33 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development of the property and installation of improvements shall be in accordance <br />with the development schedule provided by the DEVELOPER and approved by the CITY <br />(E�ibit �. <br />7.0 COMPLIANCE with LAWS and REGULATIONS <br />The DEVELOPER represents to the CITY that any site improvements pursuant to the <br />proposed Development will comply with all City, County, Regional, Metropolitan, State, <br />and Federal laws and regulations, including but not limited to the Roseville Subdivision <br />Regulations, the Roseville Zoning Regulations, and a11 other applicable environmental <br />regulations. The DEVELOPER agrees to comply with a11 such laws and regulations. <br />8.0 SITE DEVELOPMENT REQUIREMENTS <br />To ensure that the proposed development meets the CITY'S requirements and standards <br />for site development, the following provisions sha11 apply: <br />8.1 Final Grading Plan. The final grading plan for each property and/or site must be <br />reviewed and approved by the Director of Public Works before any permits will <br />be issues. All grading shall comply with the approved grading plans and shall be <br />the responsibility of the DEVELOPER. The DEVELOPER's engineer sha11 <br />provide to the CITY a letter certifying that the grading project was constructed <br />and was completed as depicted in the approved grading plan prior to the issuance <br />of a Certificate of Occupancy (Exhibit C). <br />8.2 Final Utility Servicing Plan. The final utility servicing plan for each property <br />and/or site must be reviewed and approved by the Director of Public Works prior <br />to any permits being issued for the building (Exhibit D). <br />8.3 Erosion Cont�ol. Prior to site grading, and before any utility construction is <br />commenced or building permits are issued, an erosion control plan must be <br />submitted for approval by the Director of Public Works andlar the Gras Lake <br />Watershed, and all erosion control actions shall be implemented, inspected and <br />approved by the CITY (Exhibit C�. <br />8.4 Clean Up. Each DEVELOPER shall clean dirt and debris from streets that has <br />resulted from construction work by said DEVELOPERS, its agents or assigns. <br />The CITY will determine whether it is necessary to take additional measures to <br />clean dirt and debris from the streets. After 24 hours verbal notice to the <br />developer, the CITY may complete or contract to complete the clean up at the <br />DEVELOPER'S expense. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.