My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0812_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0812_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 3:47:34 PM
Creation date
10/25/2010 1:48:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Financial Implications: <br />Estimated project costs for construction of a 6' sidewalk/trail with crosswalks and minor <br />intersection enhancements are as follows: <br />Construction Costs $ 375,000 <br />Engineering $ 82,000 <br />Total Project Cost $457,000 <br />Proposed Funding: <br />Federal Enhancement Grant Funds $300,000 <br />Ramsey County share $ 35,000 <br />City funds: Pathway Construction $ 45,000 <br />Engineering Budget 7 0 0 0 <br />Total $457,000 <br />Estimated maintenance costs $2,000 to $3,000 Annually to City Budgets <br />(includes sweeping, snowplowing, pavement repair, minor landscape maintenance) <br />Proposed Schedule: <br />If this project is desired by Council, plans need to be submitted to Mn/DOT for approval by <br />September 30, 2002. Construction would begin in Spring, 2003. <br />REC01�'Ii�'IENDED COUNCIL ACTION: <br />Direction to staff whether to pursue a project of this nature, and if desired, a motion to direct staff <br />to return to Council on September 23, 2002, with plans and for a hearing. <br />Prepared by: Duane Schwartz <br />
The URL can be used to link to this page
Your browser does not support the video tag.