Laserfiche WebLink
City Council Minutes — 08/12/02 <br />Page 19 <br />Roll Ca1L• (Voting Order) Schroeder, Maschka, Kough <br />and Kysylyczyn. <br />Continuation of Re�ular Meetin�A e� nda 7:3o p.m. <br />Due to the length of the August 12, 2002 regular Meeting <br />Agenda, and lateness of the hour, the meeting was <br />recessed and reconvened at this time for consider the <br />following items. <br />V. Reports and Recommendations <br />B. Larpenteur Avenue Pathway: Discussion of Federal Larpenteur <br />Funding, Council Direction Avenue <br />Public Works Director Schwartz provided background Pathway <br />information on Larpenteur Avenue between Hamline <br />Avenue and Dale Street; with pathway improvements <br />originally studied in the mid-90's and planned in two <br />phases. Mr. Schwartz explained that the corridor was <br />identified in the City's Pathway Plan as a priority for a <br />connecting trail from Oxford to the Trailhead of <br />Reservoir Woods, just east of Kent Street on Larpenteur <br />Avenue, accommodating completion of a major gap in <br />looping major trails in the City. <br />Staff had prepared preliminary estimates to construct a <br />six foot (6') wide sidewalk/trail within the existing right- <br />of-way along the corridor, with crosswalks and minor <br />intersection enhancements. <br />Estimated <br />Construction Costs <br />Total Proiect Cost <br />ect Costs <br />Proposed Funding Source <br />Federal Enhancement Grant Funds <br />75,000 <br />82.000 <br />57.000 I <br />Proposed <br />Funding <br />Amount <br />$300,( <br />